For Professional Technical Support call 1-844-242-2475 11
8a.Completed shallow well installation with piping and tank
is shown (Fig. 8a)
8b.Completed deep well installation with piping and
tank is shown (Fig. 8b)
NOTE:
If a pre-charged tank becomes waterlogged, the bladder is normally leaking or broken.
1. Test the tank by depressing the air valve. The air valve will expel water if the bladder is broken.
2. Replace the tank. Once a bladder is leaking or broken, the bladder cannot be repaired. The tank must be replaced
.
Standard Tank (CONVENTIONAL TYPE) Connection
From step 1 to 3 is the same as Pre-Charge Tank Connection.
4. Cement
3/4in.PVC rigid Pipe
into
3/4in.PVC
90-Degress S×S Elbow
. Cement
3/4in. PVC MPT×S
Male Adapter
into
3/4in.PVC rigid Pipe
that connect
with a
3/4in. PVC FPT×FPT Union
.(Fig. 4)
5.
Install a
3/4in. PVC MPT×S Male Adapter
into the
outlet port of the pump. (Fig. 5)
6. Install a short
3/4in.PVC rigid Pipe
. (Fig. 6)
7. Completed installation with piping and tank is shown
(Fig. 7)