No. 51828
HV-L29PRO
14
SERVICE ADJUSTMENTS
BEFORE STARTING SERVICE ADJUSTMENT
1.
There are 2 ways of adjusting this TV: One is with the
REMOTE CONTROL UNIT and the other is the conventional
method using adjustment parts and components.
2.
The setting
(adjustment) using the REMOTE CONTROL
UNIT is made on the basis of the initial setting values. The
setting values which adjust the screen to the optimum
condition can be different from the initial setting values.
3. Make sure that connection is correctly made to AC power
source.
4. Turn on the power of the TV and measuring instrument for
warming up for at least 30 minutes before starting adjustment.
5. If the receive or input signal is not specified, use the most
appropriate signal for adjustment.
6.
Never touch parts
(such as variable resistors, transformers and
condensers)
not shown in the adjustment items of this
service adjustment.
7. Preparation for adjustment (presetting):
Unless otherwise specified in the adjustment items, preset the
following functions with the REMOTE CONTROL UNIT:
"
Setting position
PICTURE MODE (VSM)
STANDARD
SLEEP TIMER
OFF
BALANCE
CENTER
ECO
OFF
ZOOM
REGULAR
MEASURING INSTRUMENT AND FIXTURES
1. DC voltmeter (or digital voltmeter)
2. Oscilloscope
3. Signal generator (Pattern generator) [PAL / SECAM / NTSC]
4. Remote
control
unit
ADJUSTMENT ITEMS
●
Checking items.
●
Adjustment of FOCUS.
●
VSM preset setting.
●
VIDEO / CHROMA circuit adjustment.
●
DEFLECTION circuit adjustment.
●
AUDIO circuit adjustment.
(Do not adjust)
MC-Service
Содержание HV-L29PRO
Страница 36: ...No 51828 HV L29PRO 36 MC Service ...
Страница 57: ...No 51828 HV L29PRO 56 PACKING 5 4 7 9 10 11 8 2 2 12 6 13 3 3 A AU EE 14 1 ...
Страница 59: ...No 51828 HV L29PRO 58 Memo ...
Страница 60: ...No 51828 HV L29PRO 59 Memo ...
Страница 66: ...HV L29PRO HV L29PRO No 51828 No 51828 2 11 2 12 100Hz PWB CIRCUIT DIAGRAM 100Hz PWB SMF0Z501A H2 MC Service ...
Страница 72: ...HV L29PRO HV L29PRO No 51828 No 51828 PATTERN DIAGRAMS MAIN PWB PATTERN FRONT 2 23 2 24 MC Service ...
Страница 73: ...HV L29PRO HV L29PRO No 51828 No 51828 FRONT TP 91 B1 TP E POWER DEF PWB PATTERN 2 25 2 26 MC Service ...
Страница 76: ...HV L29PRO HV L29PRO No 51828 No 51828 2 31 2 32 TOP AV SW PWB PATTERN TOP CRT SOCKET PWB PATTERN MC Service ...