Heating controls
6 720 645 817
(2010/09)
52
8.2
Overview of the BUS-regulated controller functions
Weather-compensated controller
Controller
FW 100
FW 200
FW 500
1 unmixed heating circuit
y
y
y
1 mixed heating circuit
y
(with IPM 1)
y
(with IPM 1)
y
(with IPM 1)
2 mixed heating circuits
–
y
(with IPM 2)
y
(with IPM 2)
4 mixed heating circuits
–
y
(with 2 IPM 2+ 2 FB 100)
y
(with 2 IPM 2+ 2 FB 100)
10 mixed heating circuits
–
–
y
(with 5 IPM 2+ 8 FB 100)
DHW heating via cylinder
(time program)
y
(with IPM 1)
y
(with IPM 1)
y
(with IPM 1)
Control of several DHW
cylinders (time program)
–
–
y
(with IPM 2)
DHW circulation (time
program)
y
y
y
Solar DHW heating
y
(with ISM 1)
y
(with ISM 1)
y
(with ISM 1)
Solar central heating
DHW heating
–
y
(with ISM 2)
y
(with ISM 2)
Cascade circuit with
up to 4 appliances
–
y
(with ICM)
y
(with ICM)
Screed drying program
y
y
y
Automatic summer/winter
changeover
y
y
y
Thermal disinfection
y
y
y
Solar optimisation -
DHW heating
y
y
y
Solar optimisation -
heating circuit
y
y
y
Convector heater and
swimming pool control
–
–
y
(with IEM)
Heat-up optimisation
–
–
–
Room temperature hook-up
y
y
y
Heating curve optimisation
y
y
y
Remote management
(Netcom 100)
y
y
y
System info
y
y
y
Holiday function
y
y
y
Tab. 27
Содержание SUPRAPUR KBR 120-3 A
Страница 114: ...6 720 645 817 2010 09 114 Notes ...
Страница 115: ...6 720 645 817 2010 09 115 Notes ...
Страница 116: ...Bosch Thermotechnik GmbH Junkersstrasse 20 24 D 73249 Wernau www junkers com ...