Site Preparation Checklist for SSR120
The checklist in
summarizes the tasks you need to perform when preparing a site for
SSR120 installation.
Table 7: Site Preparation Checklist
Date
Performed by
For More Information
Item or Task
Environment
“Environmental Requirements and
Verify that environmental factors such as
temperature and humidity do not exceed
appliance tolerances.
Power
Measure the distance between external
power sources and the installation site.
Locate sites for connection of system
grounding.
Calculate the power consumption and
requirements.
Rack
“Rack Requirements for SSR120”
Verify that your rack or cabinet meets the
minimum requirements for the installation
of the appliance.
Plan rack location, including required space
clearances.
Secure the rack or cabinet to the floor and
building structure.
Desk
Verify that the desk meets the minimum
requirements for the installation of the
appliance.
19
Содержание SSR120
Страница 1: ...SSR120 Hardware Guide Published 2022 01 17 ...
Страница 7: ...1 CHAPTER Overview SSR120 Appliance Overview 8 SSR120 Chassis 10 LTE Support on SSR120 Appliances 15 ...
Страница 48: ...3 Verify that all four Device interfaces are up 48 ...
Страница 54: ...Lithium Battery Declaration 87 ...
Страница 56: ...56 ...
Страница 60: ...Restricted Access Warning 60 ...
Страница 72: ...Unterminated Fiber Optic Cable Warning 72 ...
Страница 78: ...Jewelry Removal Warning 78 ...
Страница 81: ...Operating Temperature Warning 81 ...