background image

routers. Allow 2.8 in. (7 cm) between the side of the chassis and any non-heat-producing
surface such as a wall.

Four people are required to move the MX2008 router.

Always remove the front and rear shipping covers before removing the components.

Always remove all components before moving the router. The empty router weighs
261 lb (118.39 kg).

When installing the router, do not incline the chassis more than 10 degrees.

Measure the shipping container to make sure there is adequate clearance through
doorways and passages to accommodate the dimensions.

NOTE:

The shipping container (wooden crate) is 66.25 in. (168.27 cm)

high, 48 in. (121.92 cm) deep, and 42 in. (106.68 cm) wide.

Always reinstall the front and rear shipping covers to help move the router.

WARNING:

The shipping covers help prevent damage to the card cage and

backplanes during rack installation.

When installing components into the router, load the chassis from the bottom to the
top.

After installing components, install the EMI cover over the line cards.

If the rack is provided with stabilizing devices, install the stabilizers before mounting
or servicing the router in the rack.

When removing or installing an electrical component, always place it component-side
up on a flat antistatic surface or in an electrostatic bag.

When you install the router, always make the ground connection first and disconnect
it last.

Wire the DC PDMs by using the appropriate lugs. When you connect power, the proper
wiring sequence is ground to ground, +RTN to +RTN, then –48 V to –48 V. When you
disconnect power, the proper wiring sequence is –48 V to –48 V, +RTN to +RTN, then
ground to ground. Always connect the ground wire first and disconnect it last.

Do not work on the system or connect or disconnect cables during electrical storms.

Before working on equipment that is connected to power lines, remove jewelry, including
rings, necklaces, and watches. Metal objects heat up when connected to power and
ground and can cause serious burns or become welded to the terminals.

Failure to observe these safety warnings can result in serious physical injury.

AC power cable warning (Japan):

65

Copyright © 2017, Juniper Networks, Inc.

Safety Warnings

Содержание MX2008

Страница 1: ...uter by Using a Pallet Jack with Attachment 20 Install the Pallet Jack Attachment 20 Use the Pallet Jack with Attachment to Install the Router 21 Install the Router Using a Router Transport Kit 24 Unp...

Страница 2: ...ion Mode 61 Configure User Accounts and Passwords 61 Configure System Attributes 62 Commit the Configuration 63 Safety Warnings 64 Compliance Statements for NEBS 66 Compliance Statements for EMC Requi...

Страница 3: ...r of the chassis An extended cable manager extends the total depth to 36 82 in 93 53 cm One router can be installed in a 24 U or taller open frame or four post rack if the rack can support the combine...

Страница 4: ...For a list of the supported MPCs and MICs see the MX Series Interface Module Reference Copyright 2017 Juniper Networks Inc 4 MX2008 3D Universal Edge Router Quick Start...

Страница 5: ...ck must be strong enough to support the weight of the fully configured router up to 742 2 lb 336 66 kg for AC chassis and 664 8 lb 301 55 kg for DC chassis For the cooling system to function properly...

Страница 6: ...Figure 1 MX2008 Rack Clearance and Router Dimensions for Four Post Rack Installation Copyright 2017 Juniper Networks Inc 6 MX2008 3D Universal Edge Router Quick Start...

Страница 7: ...ransport Kit The router requires a minimum 42 in 106 7 cm diameter of space to turn the chassis on the router transport kit see Figure 3 on page 8 NOTE The router transport kit handles can be removed...

Страница 8: ...er should be lifted from the floor by using the router transport kit is 1 5 in 3 8 cm Viewed from the side the router with the router transport kit installed measures 42 in 106 7 cm high and 36 20 in...

Страница 9: ...t kit installed measures 30 78 in 78 2 cm wide see Figure 5 on page 9 Figure 5 Measurements of the Router Transport Kit Installed on the MX2008 Front View Tools Required to Unpack and Prepare the Rout...

Страница 10: ...cover Phillips screwdrivers numbers 1 2 and 3 1 2 in 12 7 mm drive ratchet 1 4 in 6 35 mm torque controlled driver or socket wrench to tighten the nuts on the router transport kit 1 1 8 in 28 57 mm t...

Страница 11: ...a minimum of 24 U unobstructed front to back usable rack space when installing the MX2008 router into a four post rack or cabinet 2 Partially insert screws into the open holes in the rear flanges of t...

Страница 12: ...rack The two rear flanges on the four post mounting shelf are adjustable from 24 in 60 96 cm through 30 in 76 2 cm to accommodate different types of racks rails If you are installing the MX2008 router...

Страница 13: ...ped in a wooden crate A wooden pallet forms the base of the crate The router chassis is bolted to this pallet A large rack mount tray a pallet jack attachment EMI covers and a cardboard accessory box...

Страница 14: ...move it NOTE The staging and installation area must be ESD approved 2 Position the shipping crate with the arrows pointing up 3 Open all the latches on the shipping crate 4 Remove the front door of th...

Страница 15: ...o the pallet jack attachment NOTE If you ordered a router transport kit see Unpack the Router Transport Kit on page 24 for instructions on how to unpack and install the router transport kit 14 Save th...

Страница 16: ...rom the Front of the MX2008 Router Number of FRUs Slots Component Description Component No 1 Craft interface 1 8 0 through 7 Switch Fabric Boards SFBs 2 2 0 and 1 Routing and Control Boards RCB 3 10 0...

Страница 17: ...2008 Router Number of FRUs Slots Component Description Component No 1 PDM1 Input1 AC power distribution module PDM Three phase delta or wye or a single phase AC PDM 1 9 0 through 8 ACpowersupplymodule...

Страница 18: ...rmation about MX2008 router components Table3 ComponentstoRemovefromtheRearofaDC PoweredMX2008 Router Number of FRUs Slots Component Description Component No 1 PDM1 Input1 DC PDM 1 9 0 through 8 DC PS...

Страница 19: ...ESD grounding strap to your bare wrist and connect the strap to an approved site ESD grounding point See the instructions for your site 2 Loosen and open the two captive screws on each side of the fa...

Страница 20: ...te 2 Place the pallet jack attachment across both pallet jack legs 3 Using a 9 16 in 14 mm socket wrench loosen and remove the eight torque fasteners for bracket support that are located on the top of...

Страница 21: ...nt and rear shipping covers to the chassis to help move the router The handles on the shipping covers are used to guide the chassis during installation CAUTION Do not lift the router by using the hand...

Страница 22: ...imately 261 lb 118 39 kg 8 Using the pallet jack position the router in front of the rack or cabinet centering it in front of the rack NOTE If you are installing the MX2008 router into a network cabin...

Страница 23: ...s contact the rack rails In a four post rack the mounting shelf ensures that the holes in the front mounting flanges of the chassis align with the holes in the rack rails see and Figure 14 on page 23...

Страница 24: ...nsport Kit to Install the Router in an Open Frame Rack on page 37 Unpack the Router Transport Kit The router transport kit is shipped in a wooden crate A wooden pallet forms the base of the crate Meta...

Страница 25: ...e router transport kit shipping crate to an ESD approved staging area where you have enough room to remove the kit for assembly 2 Position the shipping crate with the arrows pointing up 3 Remove the m...

Страница 26: ...the shipping container 8 Remove the vapor corrosion inhibitor VCI packs attached to the pallet being careful not to break the VCI packs open 9 Save the shipping crate cover pallet and packing material...

Страница 27: ...3 Phillips screwdriver loosen the captive screws that secure the router transport mounting plate and wheel assembly left and right to the router transport platform and set them aside see Figure 19 on...

Страница 28: ...aptive screws to secure the router transport mounting plate and wheel assembly to the chassis Figure 20 Installing the Router Transport Kit onto the MX2008 Router Secure the Router to the Transport Pl...

Страница 29: ...les within the T shaped levels are between the lines indicating the chassis is level CAUTION Do not raise the chassis above 1 in 2 54 cm This will ensure that the router will not tilt when transportin...

Страница 30: ...ure the router transport platform to the router transport mounting plates by using the four latch locks see Figure 22 on page 30 Figure 22 Securing the Router Transport Platform Use the Router Transpo...

Страница 31: ...rson team transport the router to the rack installation location and center it in front of the mounting shelf NOTE A minimum of 38 in 96 5 cm of clearance is required to roll the chassis sideways A mi...

Страница 32: ...elf and slightly higher than the mounting shelf see Figure 25 on page 33 NOTE Make sure the bubbles within the T shaped levels are between the lines indicating that the router is level 5 Adjust the fo...

Страница 33: ...up by turning the handles counterclockwise so that the weight of the router is on the router transport platform 8 Using a number 3 Phillips screwdriver loosen the captive screws that secure the route...

Страница 34: ...Transport Mounting Plate and Wheel Assembly 9 Attach the winch strap to the winch strap plate at the rear of the router see Figure 27 on page 35 Copyright 2017 Juniper Networks Inc 34 MX2008 3D Unive...

Страница 35: ...8 in 28 57 mm torque controlled driver or socket wrench to the winch mechanism and turn clockwise to start pulling the chassis into the rack see Figure 28 on page 36 35 Copyright 2017 Juniper Network...

Страница 36: ...lly slide the router onto the mounting shelf until the front mounting flanges contact the rack rails You must remove the winch bracket to perform this procedure There must be a minimum of 24 U of usab...

Страница 37: ...ack or cabinet centering it in front of the rack 2 Using a four person team transport the router to the rack installation location and center it in front of the rack NOTE A minimum of 38 in 96 5 cm of...

Страница 38: ...e wheels up by turning the handles counterclockwise so that the weight of the router is on the router transport platform 7 Using a number 3 Phillips screwdriver loosen the captive screws that secure t...

Страница 39: ...asping the handles on the shipping covers carefully slide the router into the rack until the center mounting brackets contact the rack rails see Figure 31 on page 40 39 Copyright 2017 Juniper Networks...

Страница 40: ...m aside 10 Secure the router to the rack by using the mounting screws provided by the rack manufacturer 11 Visually inspect the alignment of the router To verify that the router is installed properly...

Страница 41: ...re wrist and connect the strap to one of the ESD points on the chassis For more information about ESD see the MX2008 3D Universal Edge Router Hardware Guide 6 Place the grounding cable lug over the gr...

Страница 42: ...e the shipping covers before installing router components 2 Slide each component into the chassis evenly so that it does not become stuck or damaged 3 Tighten the captive screws and secure all levers...

Страница 43: ...the management device 2 Plug one end of an RJ 45 Ethernet cable into the ETHERNET port on the RCB 3 Plug the other end of the cable into the network device CAUTION You must use shielded cables for the...

Страница 44: ...oving cable The safety cap keeps the port clean and prevents accidental exposure to laser light 3 Insert the cable connector into the cable connector port on the faceplate 4 Arrange the cable in the c...

Страница 45: ...e 2 Switch off the dedicated customer site circuit breakers Ensure that the voltage across the AC power source cable leads is 0 V and that there is no chance that the cable leads might become active d...

Страница 46: ...If the PDM must be removed both input power cables must be uninstalled and removed from the PDM before the PDM can be removed from the chassis The MX2008 chassis is not sensitive to phase rotation seq...

Страница 47: ...AC voltage to the PDM with disengaged PSM to make sure that two LEDs on the PDM are lit green and that the AC voltage between AC terminal blocks A1 B1 B1 C1 C1 A1 A2 B2 B2 C2 and C2 A2 for three phas...

Страница 48: ...for the other three phase delta AC PDMs 18 Connect the three phase delta AC power cord mating connector to the AC power cord connector see Figure 35 on page 48 Table 5 on page 48 shows the approved th...

Страница 49: ...disengage all AC PSMs 5 Using a number 2 Phillips screwdriver unscrew the four captive screws located on the either side of the metal AC wiring compartment four screws total per PDM 6 Remove the cove...

Страница 50: ...SMs a Insert the grounding wire into the grounding point labeled GND b Insert the wire labeled L1 into the input terminal labeled A1 c Insert the wire labeled L2 into the input terminal labeled B1 d I...

Страница 51: ...hase wye PDM is not more than 264VAC when measured with a DVM Then turn off the AC breaker de energizing the PDM and install the metal cover and engage all AC PSMs NOTE The color of each AC power wire...

Страница 52: ...nector to the AC power cord connector see Figure 37 on page 52 Table 7 on page 52 shows the approved three phase wye AC power cord mating connector specifications Figure 37 Three Phase Wye AC Power Co...

Страница 53: ...aft interface Each PDM has an LED per feed indicating whether the feed is active or not or whether the feed is connected properly Figure 38 Selecting AC Power Subsystem Feed Redundancy PWR OK FAULT IN...

Страница 54: ...and INP1 voltage out of range On Yellow PSM is not functioning normally or the AC input voltage is out of range Off PSM is not functioning normally or the AC input voltage is out of range On Red FAUL...

Страница 55: ...here is no chance that the cable leads might become active during installation 3 Remove the DC PDM from the electrostatic bag 4 Using both hands slide the PDM part way into the chassis 5 Open the two...

Страница 56: ...page 56 describes the DC operating range specifications Table 9 MX2008 DC Power System Input Voltage Specification Item Operating range 40 through 72 VDC DC input voltage Figure 40 Connecting Ground a...

Страница 57: ...le restraint cover over the terminal studs and tighten the captive screws Connect DC Power Supply Modules To install an MX2008 DC PSM 1 Verify that the power switch on the PSM is in the off O position...

Страница 58: ...ve screws to secure the PSM to the chassis NOTE The MX2008 systems configured for DC input power must use only DC PDMs and DC PSMs AC and DC PSMs or PDMs must not be mixed within a single system 5 Ver...

Страница 59: ...DIP switches are set to off Off DC input is within required voltage range and the DIP switch is set to on On Green INP0 DC input is detected but voltage is out of range On Yellow DC input to the PSM...

Страница 60: ...NOTE Each PSM slot not occupied by a DC PSM must be covered by a PSM blank panel Copyright 2017 Juniper Networks Inc 60 MX2008 3D Universal Edge Router Quick Start...

Страница 61: ...ge 62 Commit the Configuration on page 63 Enter Configuration Mode 1 Verify that the network device is powered on 2 Log in as the root user There is no password 3 Start the CLI root cli root 4 Enter c...

Страница 62: ...domain name edit root set system domain name domain name 4 Configure the IP address and prefix length for the router s management Ethernet interface edit root set interfaces fxp0 unit 0 family inet ad...

Страница 63: ...thod password public key name server address interfaces fxp0 unit 0 family inet address address prefix length 2 Commit the configuration to activate it on the router edit root commit 3 Optionally conf...

Страница 64: ...the shield for the wiring must be grounded at both ends CAUTION Before removing or installing components of a router attach an ESD strap to an ESD point and place the other end of the strap around you...

Страница 65: ...ver over the line cards If the rack is provided with stabilizing devices install the stabilizers before mounting or servicing the router in the rack When removing or installing an electrical component...

Страница 66: ...lies an external surge protective device SPD must be used at the AC power source Compliance Statements for EMC Requirements for Juniper Networks Devices Canada on page 66 European Community on page 66...

Страница 67: ...nited States The hardware equipment has been tested and found to comply with the limits for a Class A digital device pursuant to Part 15 of the FCC Rules These limits are designed to provide reasonabl...

Страница 68: ...guides 7100059 en pdf Product warranties For product warranty information visit http www juniper net support warranty JTAC hours of operation The JTAC centers have resources available 24 hours a day 7...

Страница 69: ...17 530 073846 Revision 1 Initial release Copyright 2017 Juniper Networks Inc All rights reserved Juniper Networks Junos Steel Belted Radius NetScreen and ScreenOS are registered trademarks of Juniper...