Table 52: Switch Fabric Board Removal Alarm Times
(Continued)
Line Card Type
Ambient Temperature (°C)
Traffic (%)
Duration
MX10K-LC2101
33
100%
3 min 28 sec
40
100%
2 min 4 sec
MX10K-LC480
40
100%
6 min
Ensure that you have the following equipment before you install an SFB:
• Antistatic bag or antistatic mat
• Electrostatic discharge (ESD) grounding strap
• Phillips (+) number 2 screwdriver (optional)
• Replacement SFB
To install an MX10004 Switch Fabric Board:
1.
Place an antistatic bag or an antistatic mat on a flat, stable surface.
2.
Wrap and fasten one end of the ESD grounding strap around your bare wrist and connect the other
end of the strap to an ESD point on the chassis. An ESD point is located next to the protective
176