b. Attach the AC power cables to the respective clips.
6.
Follow the appropriate steps to connect the other end of the cables to the power
source in your plant. Ensure the power source to which you are connecting the cables
is powered off.
7.
Turn on the main power source.
8.
Switch on one rectifier at a time.
The AC PEM LED starts to light up. The AC OK light turns solid green when the module
is ready. Wait for the AC OK light before proceeding to power the next rectifier.
You have successfully completed this procedure.
Powering the BTI7802 Chassis
•
Installing and Cabling the BTI7802 DC PEM on page 101
•
Installing and Cabling the BTI7802 AC PEM on page 103
Copyright © 2019, Juniper Networks, Inc.
100
BTI7800 Series Hardware Overview and Installation Guide
Содержание BT8A78CH1
Страница 8: ...Copyright 2019 Juniper Networks Inc viii BTI7800 Series Hardware Overview and Installation Guide...
Страница 14: ...Copyright 2019 Juniper Networks Inc xiv BTI7800 Series Hardware Overview and Installation Guide...
Страница 20: ...Copyright 2019 Juniper Networks Inc xx BTI7800 Series Hardware Overview and Installation Guide...
Страница 68: ...Copyright 2019 Juniper Networks Inc 68 BTI7800 Series Hardware Overview and Installation Guide...
Страница 74: ...Copyright 2019 Juniper Networks Inc 74 BTI7800 Series Hardware Overview and Installation Guide...
Страница 99: ...99 Copyright 2019 Juniper Networks Inc Chapter 4 Installing the BTI7800 Series Chassis...
Страница 178: ...Copyright 2019 Juniper Networks Inc 178 BTI7800 Series Hardware Overview and Installation Guide...
Страница 210: ...Copyright 2019 Juniper Networks Inc 210 BTI7800 Series Hardware Overview and Installation Guide...