3.6
Checks and operations to be carried out when the truck is
operational
WARNING!
Risk of accident due to damage to or other defects in the truck and optional
features
If damage or other truck or attachment (optional equipment) defects are discovered
during the following checks, the truck must be taken out of service until it has been
repaired.
u
Report any defects immediately to your supervisor.
u
Mark defective truck and take out of service.
u
Do not return the industrial truck to service until you have identified and rectified
the fault.
Procedure
• Test warning indicators and safety devices:
• Test the Emergency Disconnect function by pressing the Emergency
Disconnect switch. The main circuit is disconnected and no truck operations
can be performed. Now pull the Emergency Disconnect switch to unlock it.
• Test the horn by pressing the "warning signal" button.
• Test the effectiveness of the brakes, see page 69.
• Test the steering, see page 68.
• Test the hydraulic system, see page 71.
• Test travel operations, see page 66.
• Test the controls and displays and check for damage, see page 49.
• Check the controls are automatically restored to the neutral position after being
applied.
59
04.19 en-GB
Содержание ESE 220
Страница 1: ...ESE 220 320 03 10 Operating instructions 51163703 04 19 en GB ESE 220 ESE 320...
Страница 2: ...2...
Страница 4: ...4 04 19 en GB...
Страница 10: ...10 04 19 en GB...
Страница 14: ...14 04 19 en GB...
Страница 49: ...2 Displays and Controls 5 7 10 49 50 51 52 53 11 14 13 54 55 56 17 49 04 19 en GB...
Страница 70: ...17 10 70 04 19 en GB...
Страница 79: ...The brake is now released The truck can be moved 79 04 19 en GB...
Страница 148: ...148 04 19 en GB...