14
to "1", "3", "5" and "reverse 1" respectively; and "high gear" corresponds to "2", "4", "6" and
"reverse 2" respectively. When the shift lever is operated to shift gears, the increase and decrease
should be carried out step by step, and the upshift is not allowed.
2.1.3.After the machine is started, step on the clutch with the left foot (the clutch is located at the
lower left foot, see Fig.6), shift to the "1 gear", slowly release the clutch, release the parking brake
(see Fig. 6, the parking brake is on the right side of the seat), and step on the accelerator (the
accelerator is on the outside of the right foot, see Fig.6), and the machine starts to walk.
2.2.Four link lifting (Hydraulic multi-way valve-5 units):
The position of the machine is controlled by four links. The four link is located at the front end of
the machine, and the sprayer spray device is mounted on the four connecting rod. The lifting of the
four link rod is controlled by the hydraulic cylinder, and the control handle is located on the right
side of the operator, as shown in Fig.8. The operating handle on the left side of the control valve
controls the lifting of the four connecting rods, pushing them upward to raise them and pressing
them down to lower them (operate according to the sign board). During operation, the hand controls
the handle until the four links are in the required position.
Fig. 8: Schematic diagram of hydraulic multi-way valve (5 units)
2.3.Boom and divider operation:
The boom of this machine is a truss structure. The boom is composed of five sections. The middle
section is fixed. The left and right sections can be expanded and retracted respectively. Controlled
by hydraulic cylinder, the multichannel valve control handle is located at the right front of the
operator, as shown in Fig.9. The left 2 operating handle on the control valve controls the boom
extension of the boom on both sides, and the left 3 handle controls the boom boom boom extension
on both sides. Push the boom upward to extend and press the boom down to retract (operate
Boom
extension
Four link
lifting
Divider
lifting
Balance
cylinder lifting
Boom small
extension