6 Safety Manual
56
6.10.3
Proof test C
With proof test C, the following values for the proof test coverage (PTC) can be achieved:
Step
Action
Please note
1
Test the current device status of the test piece with the setup program.
Status must be 'OK'
2
If active, deactivate SIL operation of the test piece.
Configure analog output for simulation of current output signal.
Simulate the following output signal values and verify either using down-
stream devices in the operating facility or using a current meter that is ad-
ditionally connected:
Verification of the proper function of the
analog output including whether the er-
ror signal values can be generated.
Simulated value:
Measured value:
3.6 mA
3.59 to 3.61 mA
8 mA
7.99 to 8.01 mA
16 mA
15.99 to 16.01 mA
21.2 mA
21.19 to 21.21 mA
3
Reactivate SIL operation.
Disconnect the line of the analog output signal at connection 42(+).
The test piece must signal an error after approx. 5 s.
Verify that the relay output limit value (extra code) has fallen.
Verification that in the event of interrup-
tion of the output current signal, the in-
ternal test identifies the interruption of
the signal path and signals it. Relay
drops out.
Voltage supply
Detection of dangerous undetected failures (
λ
DU
)
PTC
AC 110 to 240 V +10/-15 %, 48 to 63 Hz
0.454
45.4 %
DC 24 V +10/-15 %
0.440
44.0 %
Содержание dTRANS T06
Страница 16: ...3 Mounting 16 3 Mounting 3 1 Dimensions...
Страница 18: ...3 Mounting 18 3 4 Dismounting Place screwdriver in release catch and press upwards 1 Remove housing upwards 2...
Страница 30: ...5 Startup of the device 30 Here is a summary of the parameters from the figure above...
Страница 31: ...5 Startup of the device 31...
Страница 40: ...6 Safety Manual 40 0 0 6 6 0 0 6 6 7 0 0 6 0 0 6 0 0 6 0 0 6 8...
Страница 59: ...6 Safety Manual 59...
Страница 79: ...8 Device info 79...
Страница 103: ...12 What to do if 103...
Страница 104: ...13 Certificates 104 13 Certificates SEBS A 093409 14 V1 0...
Страница 110: ...13 Certificates 110...
Страница 111: ......