4 Commiss
ioni
ng t
h
e in
st
ru
me
nt
10
Switch-on delay after power-on
for staggered switch-on of several equipment units.
0
... 60min
Minimum ON time
Minimum OFF time
Here you can set the time for which the equipment unit, for instance, has to
remain switched on or off. These values depend on the heating or cooling
unit being used (observe manufacturer’s specifications).
In the event of a
probe error,
the relay is operated immediately as set in
parameter S.Er.
0
... 999 s
0
... 999 s
Alarms
Low alarm limit
As soon as the process value falls below this limit, the alarm message
is displayed, see Chapter 7 “Alarm messages”.
-999 ...
-200
... +999
High alarm limit
As soon as the process value goes above this limit, the alarm message
is displayed, see Chapter 7 “Alarm messages”.
-999 ...
500
... +999
Alarm hysteresis
The hysteresis that was set is below
or above
.
0.2 ...
1.0
... 99.9
Alarm suppression time
An alarm from
or
is not displayed for this time. If an alarm is
present for longer than
, then it will be displayed.
0
... 60 min
Parameter
Meaning
Value range
from...
factory-set
...to
Содержание B 70.1050.0
Страница 1: ......
Страница 6: ...2 Mo 2 Montage 55 C 90 1 2 Demontage...
Страница 23: ......
Страница 24: ......
Страница 25: ......
Страница 26: ...Overview of operation...
Страница 30: ...2 Asse 2 Assembling 55 C 90 1 2 Disassembling...
Страница 32: ...3 Electrica 3 2 Connection diagram V The electrical connection must only be carried out by specialist personnel...
Страница 41: ...5 Operation...
Страница 47: ......
Страница 48: ......
Страница 49: ......
Страница 54: ...2 Mo 2 Montage 55 C 90 1 2 D montage...
Страница 71: ......
Страница 72: ......