![Jumil 3060PD Скачать руководство пользователя страница 11](http://html1.mh-extra.com/html/jumil/3060pd/3060pd_instruction-manual_2031067011.webp)
11
3060/70 - 3080/90 - 7080/90PD
START CALIBRATION
PROCEDURE
To start the calibration procedure, enter the desired rate to be distributed per hectare in the field
Manure Rate
and then click on
.
ATTENTION:
Before beginning the calibration procedure, make sure that all the manure distributors are not clogged
/ stuffed with any impurity that might impair the material collection.
When clicking on
a warning will be displayed to position the collectors (plastic bags and buckets) in
the manure distributors and then press
to start the procedure.
The manure deposit volume occurs automatically after its calibration.
ATTENTION:
Make sure that the hydraulic command is driven and that the tractor is in working rotation. For this
procedure, it is recommended that all the seeder / fertilizer lines are collected.
When starting the calibration, only the manure trans
-
mission will spin, pouring the product in the collectors that
were previously positioned. The transmission will stop only
when the reference bar reaches its end.
NOTE:
In average, each line will be falling
approximately 1 kg.
SYSTEM OPERATION