Transport and installation
35
6.2 Install the device at the operating location
This section describes how the device is set up at the installation location.
The device has been transported to the operation location.
The size and infrastructure of the operation location are suitable for device
operation.
1. If possible, position the device under an extraction system.
Depending on the bath fluid, gases may be created at high temperatures.
Recommended minimum distance of 1 m to other devices, to prevent
electromagnetic interference.
2. Place the device on a level, smooth, non-flammable surface.
3. Ensure that the device is securely positioned.
4. For refrigerated circulators: Ensure an open space in front of and behind the
device of at least 20 cm.
The device is set up at the operation location.
Содержание CORIO CP-1000F
Страница 72: ......