
– 4 –
3-2. Opening and closing of the control box (SC-910)
When openng and closng the control box, move
the knee lfter components
2
to the poston
where screw hole
1
can be observed and perform
the work.
For the connecton of the cords and settng of the
control box, refer to the Instructon Manual for
SC-90 together wth ths Instructon Manual.
1
2
5) In case the AK-devce s not provded, attach
head support rod
9
to the machne table.
6
7
9
6) Place urethane filter
!0
on
A
. Then put sheet-
metal (fine-mesh sheet) type filter
!1
on the
urethane filter.
Place sheet-metal (fine-mesh sheet) type
filter
!2
on
B
.
Remove nlet port for crculaton
!3
fixed on
the rght hook drvng shaft saddle. Remove
cap
!4
from the end of the nlet port. Then,
securely insert the inlet port into filter
!5�
untl
t wll go no further.
If inlet port for circulation
!3
is not
fully inserted into filter
!5�
, a faulty
circulation can occur.
!3
A
B
!0
!5�
!1
!4
!2