KE2000 Installation Manual
46
The bank stopper mounting positions stated in
Table 16-3-1 are used for reference.
According to the actual installation status, the
bank stopper needs to be mounted at a
position where a large portion of the bank
stopper is in contact with the trolley stopper
plate.
The left and right bank stopper mounting
positions may also vary depending on the
machine installation place (floor level of the
machine installation factory).
16-4. Adjusting the bank valve position
Move the bank valve fixing position left or right according to the positional relationship
between the overall feeder exchange trolley and machine main unit.
Loosen the fixing screws and adjust the bank valve position so that the bank valve shaft
turns on the bank valves at the same time. After the adjustment has been completed,
tighten the fixing screws.
Fig
16-4-1
Fig
16-3-2
Bank stopper
Trolley stopper plate
Fixing screw
Bank valve
Fixing screw
Center portion
Left and right ends