KE2000 Installation Manual
10
4.
Adjusting the transport height and leveling the machine
4-1. KE-2010/2020/2040
<Procedure>
1. Detach the cover FB, cover RBC, cover RBR, and cover RBL (Fig 4-1-1).
Detach the air cap put at the end of the rail (Fig 4-1-2,Fig 4-1-3).
※
For only the model KE-2030, the rail is separated into four pieces, IN buffer, IN center
station, OUT center station, and OUT buffer.
Fig
4-1-1
Fig
4-1-2
Fig
4-1-3
Cover FB
Cover RBR
Cover RBC
Cover RBL