ASSEMBLING YOUR RAPID CLAMP TOOL MOUNTS
1. Attach a Mounting Rail (Part #3) to the top of a Rapid Clamp Tool Mount (Part #2) using two M8*20
Carriage Bolts (Part #9), ensuring the bolt heads are up. Only hand tighten at this point.
2. Repeat Step 1 for the Second Rapid Clamp Tool Mount.
3. To determine the best placement of the power tool on the Mounting Rail, place the Rapid Clamp Tool
Mounts onto the center of the Miter Saw Station. The Mounting Rails can then be adjusted forward or
backward as needed along the Rapid Clamp Tool Mount.
4. Tighten down all of the M8 Nuts (Part #10).
7
Mounting Rail
Rapid Clamp
Tool Mount Base