ProNav Norway – a
Company
page 32
Rev.1
10.02.2020
Surface-mounting the V200s
,
Continued
Surface-
mounting the
V200s
,
continued
Table 2-2: Bottom-up, Surface-mounting the V200s (continued)
Step
Action
5
Place the V200s over the mounting holes and insert the
mounting screws through the bottom of the mounting
surface into the V200s.
6
Tighten to a torque of 8 - 10 lbs-ft. The maximum thread
depth engagement must be no more than 0.50 in!
Damage resulting from over-tightening is
not covered by the warranty.
Surface-
mounting the
V200s from the
top down for
straight cable
and for right-
angle cable
Complete the following steps to surface-mount the V200s from the top
down.
Table 2-3: Top down, Surface-mounting the V200s
Step
Action
1
Secure the Surface Mount Adapter (676-0043-10) to the
V200s using the supplied mounting hardware. Tighten to a
torque of 8 - 10 lbs-ft. The maximum thread depth
engagement must be no more than 0.50 in!
Figure 2-7: Surface Mount Adapter
(676-0043-10)
Figure 2-8: Surface Mount Adapter secured to V200s
2
Determine the desired location and proper orientation for
the V200s. See “
” for information on
determining the desired orientation.
Continued on next page