13
2-2
UPPER MAIN FRAME CONTROL LEVER INSTALLATION
Note: Be sure to install the Elevator
Arm Units in their proper
location as there is a “Front”
and a “Rear” Unit (Step 1-5).
Nylon Washer
Elevator Arm Bushing
3x6mm Socket Head Bolt
Elevator Arm Bushing
Nylon Washer
3x8mm Socket Head Bolt
........2 pc
........4 pc
........1 pc
Nylon Washers
........4 pc
......1 pc
3x22mm Socket Head Bolt
Elevator Arm Bushing
........2 pc
Mixing Base Nut
........2 pc
........1 pc
Mixing Base Nut (2 pc)
3mm Flat Washer
3x6mm Socket Head Bolt
Roll Bell Crank Spacer
........1 pc
3mm Lock Nut
Use Threadlock
3x8mm Socket
Head Bolt
Z,Q
Nylon Washer
3mm Lock Nut
Roll Bell
Crank Spacer
3x22mm Socket Head Bolt
3x6mm Socket
Head Bolt
(Use Threadlock)
3x4.5x.4mm
Steel Washer
Roll Bell
Crank
B
C
Adjustment Length
Rod Length
Assemble and attach the Control Rods to the
Mixing Levers/Control Arms as shown:
Note: When adjusting final control rod
lengths, make sure that “JR Propo”
moulded into the Ball Link faces outwards
before attaching to the Steel Joint Balls.
A
Rod Length
Adjust Length To
120mm
104mm
55mm
36mm
90mm
72mm
A
B
C
3x8mm Socket
Head Bolt
(Use Threadlock)