4-8
ROTOR HEAD INSTALLATION
25
Be sure to engage the Phase Adjusting Ring Pin into the
Washout Base Groove before securing the Rotor Head
Assembly in place.
*Note: Be sure to use the special
3x22mm Long Shank Bolt
(included in the separate
screw bag)
When the Main Rotor Head is secured in place, make sure the Swashplate
and Washout Assembly are aligned 90° to the helicopter. This procedure is
important to insure correct control inputs. Adjust the Phase Adjusting
Ring if necessary.
3mm Lock Nut
3x26mm Socket Head Bolt
Completed Rotor Head Assembly
....1 pc
3x26mm Socket Head Bolt (Long Shank)
....1 pc
3mm Nut
*
Z,Q