3) Install the shifter shaft ASSY finished above to transmission. (See Figure 74)
Figure 74
B. Front
Wheel
Alignment
a)
Put the vehicle on level ground.
b) The “toe-in” of the front wheels should be 1.18 inches. To check for alignment,
measure distance A and B between the centerline (CL) of the wheels. The proper
toe-in dimension A should be 1.18 inches greater than dimension B.
c) To adjust the alignments, loose the lock nuts on both sides of Front Tie Rods. To
make Dimension B smaller, turn the rod to the left. Turn the rod to the right to make
Dimension B larger. After adjusted to desired length, tighten the lock nut against the
rod end. Recheck the dimensions for proper alignment.
Step 2 finished
Shifter shaft ASSY
Bolt M10x1.5x20
Содержание JNSZ650DLB
Страница 6: ...Warranty policy...
Страница 7: ......
Страница 8: ......
Страница 9: ......
Страница 10: ......
Страница 11: ......
Страница 12: ......
Страница 13: ......
Страница 14: ......
Страница 15: ......
Страница 16: ......
Страница 57: ...Figure 75...
Страница 60: ...Parts manual CYLINDER BLOCK PART...
Страница 88: ...Frame 24 23 25 20 21 22 1 2 3 4 5 6 7 8 9 10 12 11 13 15 14 16 17 18 19...
Страница 111: ...Electric appliance 26 30 29 28 27 16 2 2 14 8 7 15 4 1 1 3 22 23 24 20 21 12 19 5 6 18 11 11 25 13 32 31 9 10 12 17...
Страница 123: ...safty belt tube option NO ERP Code Part No Part Description Qty 1 02 D650 08 01 0013 D650 08 01 00 13 safty belt tube 2...
Страница 127: ...Preparation attach instruction Remove packing...
Страница 129: ...front shock absorber stub axle Attach...
Страница 131: ......
Страница 134: ......
Страница 136: ...Attach rear shock absorber and rear wheel...
Страница 141: ...Attach seats and safety belt...
Страница 142: ...check vehical...
Страница 143: ...DEALER PRE DELIVERY INSPECTION _______Jumping the vehicle can cause serious damage to the drive train axle...