
Attach tie rod and front whees
3
3
1
for
wa
rd
1. Install the shaft of outer tie rod end-1 to stub axle,R
from the underside (nut on top).
2. Install flat washer,spring washer then tighen nut.
Note: don't adjust outer tie rod end as wheel alignment is done before packing.
3. Attach the wheel(27*8-12),FR-2 on the hub, tighten the nuts.
4. Attach the wheel(27*8-12),FL-3 as described above .
Attach tie rod end and front wheel
Q'ty
Description
code name
2
1
1
1
tie rod end
2
1
D650.05.01.03.00
stub axle,R
tie rod end
S650.03.01.04.00A
right wheel(27*8-12)
left wheel(27*8-12)
S650.03.01.01.00A
02.S650.03.01.01A
02.S650.03.01.04A
02.D650.05.01.03
Erp code
No.
Содержание JNSZ650DLB
Страница 6: ...Warranty policy...
Страница 7: ......
Страница 8: ......
Страница 9: ......
Страница 10: ......
Страница 11: ......
Страница 12: ......
Страница 13: ......
Страница 14: ......
Страница 15: ......
Страница 16: ......
Страница 57: ...Figure 75...
Страница 60: ...Parts manual CYLINDER BLOCK PART...
Страница 88: ...Frame 24 23 25 20 21 22 1 2 3 4 5 6 7 8 9 10 12 11 13 15 14 16 17 18 19...
Страница 111: ...Electric appliance 26 30 29 28 27 16 2 2 14 8 7 15 4 1 1 3 22 23 24 20 21 12 19 5 6 18 11 11 25 13 32 31 9 10 12 17...
Страница 123: ...safty belt tube option NO ERP Code Part No Part Description Qty 1 02 D650 08 01 0013 D650 08 01 00 13 safty belt tube 2...
Страница 127: ...Preparation attach instruction Remove packing...
Страница 129: ...front shock absorber stub axle Attach...
Страница 131: ......
Страница 134: ......
Страница 136: ...Attach rear shock absorber and rear wheel...
Страница 141: ...Attach seats and safety belt...
Страница 142: ...check vehical...
Страница 143: ...DEALER PRE DELIVERY INSPECTION _______Jumping the vehicle can cause serious damage to the drive train axle...