![Jorvet J0558X Скачать руководство пользователя страница 7](http://html1.mh-extra.com/html/jorvet/j0558x/j0558x_user-manual_2026865007.webp)
7
PRODUCT OPERATION
REFER TO PRODUCT INSTALLATION GUIDE FOR ILLUSTRATION
FOLLOW ALL STEPS ACCORDINGLY
u
Remove all cartons from the main package.
u
Remove the machine H-Frame base unit.
u
Unpack and inspect remaining components for damage. Be sure to retain the mounting
hardware contained inside package.
u
Attach middle shelf to center post using 3 bolts.
u
Attach center post with middle shelf attached to H-frame base with 4 bolts.
u
Attach mounting plate assembly to center pole with 4 bolts.
Note: Two people
recommended for this step.
u
Attach rebreathing head to mounting plate assembly using supplied bolts and allen
wrench.
u
Connect black supply line to the hose barb on the left side of the rebreathing head.
Warning: Open pop-off valve prior to use.
u
Install anesthetic vaporizer onto frame with vaporizer spacer block positioned on the
front face of the mounting plate and tighten.
Note: Two people recommended for this
step. Mounting hardware supplied with vaporizer.
u
Connect the inlet and outlet endcaps using a push and twist action to provide a leak
free attachment.
Note: This step can be performed prior to installing the vaporizer
onto the frame if needed.
u
Connect oxygen (carrier gas) supply source to the DISS Male fitting on the back of the
flowmeter.
Note: For Model J0558X see next page for Concentrator Kit installation.
u
Turn the oxygen (carrier gas) supply on.
u
Connect appropriate active or passive waste gas scavenging system to the 19mm
outlet of the pop-off valve.
u
Ensure vaporizer has been filled per manufacturer’s instructions and is ready for use.
u
Fill absorber canister to line indicated on canister. Use supplied downtube cover (on
chain) when filling. Attach absorber canister to the rebreathing head and tighten.
Note: Absorbent not included.
u
Leak test following instructions on 10 second pressure test card.