
8. Make a mark on one end of the shaft. Push out the
shaft with a puller. Tap out the bearing and remove
the spacer.
8.6.8 To sharpen and balance the blades
WARNING: Use protective gloves to prevent
injury.
1. Remove the blades. Refer to
on page 42.
2. Put the blades in a vise.
3. Sharpen the blades with a file.
4. To balance the blades put a rod horizontally in a
vise.
5. Put the center hole of the blade on the end of the
rod.
6. If the blade rotates, remove material with the file at
the end of the blade that points down. Do this until
the blade is correctly balanced.
7. Attach the blades.
8.7 Equipment frame
8.7.1 To remove the equipment frame
1. Remove the cutting deck. See
2. Measure the adjustment screw positions. Make a
note of the values and use them as initial values
when assembling.
3. Remove the adjustment screws to release the
springs.
4. Put a small screwdriver through the chain to prevent
that the chain goes into the frame.
5. Loosen the chain from the equipment frame.
6. Remove rear joint screws of the equipment frame
behind the front wheels.
8.7.2 To install the equipment frame
1. Put the equipment frame in position.
2. Assemble the equipment frame in opposite
sequence of removal.
3. Adjust the ground pressure. See
adjust the ground pressure from the cutting deck on
page 40.
659 - 001 - 11.04.2018
Repair instructions - 43
Содержание FR 2213 MA
Страница 1: ...Workshop manual FR 2213MA FR 2216MA FR 2216MA 4x4 English 659 001 11 04 2018 ...
Страница 54: ...54 Technical data 659 001 11 04 2018 ...
Страница 55: ...659 001 11 04 2018 Technical data 55 ...
Страница 56: ...www jonsered com 1159918 26 2018 07 05 ...