background image

6

daintree 

curved shower screen

                   

 

INSTALLATION GUIDE

JohnsonSuisse

 

 

 

 

14

 

14

4

4

5

3

3

13

13

 

 

 

10

+

-

A    

 

 

 

11

7

10

7

B    

A    

 

 

 

1

2

B

C

D

8

10

9

11

Clip the bottom of the door into the bottom rail(6). The 
rollers(14) are pressed down to allow the rollers clip to be 

into the rail.

Adjust the sliding doors(4) using the screws located on the 
bottom of top roller assemblies(13). Adjust rollers so that 
the sliding doors (4) are parallel to the fixed panels(3) and 

parallel to each other. Note: Do not overtighten top rollers 
as this will cause the bottom rollers to jamb and or break.

Gently knock the sealing strips(7) onto the fixed panels 
and  doors  Attach  the  door  handles(11)  to  the  sliding 

doors making sure there is a washer between the glass 
and the handle. Gently knock the magnetic sealing 

strip(10) onto the sliding doors 

Adjust  fixed  panel  extrusions(2)  in  or  out  on  the  wall 
jambs(1)  so  that  the  top  rail(5)  is  horizontal  and  the 

whole screen sits square on the shower base/shower area.

(B=C=D)

Содержание daintree curved shower screen

Страница 1: ...1 daintree curved shower screen INSTALLATION GUIDE JohnsonSuisse...

Страница 2: ...do so other secure means of fixing must then be considered AFTER CARE INSTRUCTIONS This shower screen has been treated with EnduroShield easy to clean glass surface treatment Please follow the care in...

Страница 3: ...l jambs 2 2 x Fixed panel extrusions 3 2 x Fixed panels 4 2 x Sliding doors 5 1 xTop rail 6 1 x Bottom rail 7 4 x Sealing strips 8 2 x Fixed panel seal long 9 4 x Fixed panel seal short 10 2 x Magneti...

Страница 4: ...ated in the top rail 5 Make sure that the panel is firmly up against the fixed panel block 12 and fully inserted into the short seals 9 Hint Wet the edge of glass and seal to make it easier to insert...

Страница 5: ...Recheck measurements 3 Remove jambs and drill 6mm holes with drill bit Insert the plastic wall plugs Note Please use the right fixing for the surface you are screwing into to ensure that the jamb is...

Страница 6: ...ing doors 4 are parallel to the fixed panels 3 and parallel to each other Note Do not overtighten top rollers as this will cause the bottom rollers to jamb and or break Gently knock the sealing strips...

Страница 7: ...ause you physical harm Always inspect and count parts supplied before installing as warranty may be voided on certain components once installation has begun Ensure that all walls are plumb and the sho...

Страница 8: ...provided by Gemini Industries Pty Ltd ABN 87 079 297 617 2 97 Banksia St Botany NSW 2019 P 1300 717 717 F 1300 746 480 E sales gemini industries net Gemini Industries provides a 1 year parts and labo...

Отзывы: