background image

4

daintree 

curved shower screen

                   

 

INSTALLATION GUIDE

JohnsonSuisse

9

9

12

12

6

5

9

12

12

9

5

3

3

6

3

3

3

3

5

6

1

3

2

4

Insert fixed panel end block(12)first then short fixed panel 
seal(9)into slot on both bottom and top rails(5)(6). (Usually 
comes preinstalled in top and bottom rail.)

Note:Pre-assembly of screen is required. Make sure this is 
done in a clean and litter free space so screen does not get 
damaged

Push fixed panels(3) into seal that is located in the top rail(5). 
Make sure that the panel is firmly up against the fixed panel 
block(12)and fully inserted into the short seals(9). Hint-Wet 

the edge of glass and seal to make it easier to insert panel. 

Push  fixed  panels(3)  into  seal  that  is  located  in  the 
bottom  rail(6).Make  sure  that  the  panel  is  firmly  up 
against  the  fixed  panel  block(12)and  fully  inserted  into 
the short seals(9). Hint-Wet the edge of glass &seal to 

make it easier to insert panel. 

Screw the fixed panel extrusion(2) to the top and bottom 

rals. Please make sure that the location of the screw holes 

in the fixed panel extrusion line up with the holes in the top 

and bottom rails.

Содержание daintree curved shower screen

Страница 1: ...1 daintree curved shower screen INSTALLATION GUIDE JohnsonSuisse...

Страница 2: ...do so other secure means of fixing must then be considered AFTER CARE INSTRUCTIONS This shower screen has been treated with EnduroShield easy to clean glass surface treatment Please follow the care in...

Страница 3: ...l jambs 2 2 x Fixed panel extrusions 3 2 x Fixed panels 4 2 x Sliding doors 5 1 xTop rail 6 1 x Bottom rail 7 4 x Sealing strips 8 2 x Fixed panel seal long 9 4 x Fixed panel seal short 10 2 x Magneti...

Страница 4: ...ated in the top rail 5 Make sure that the panel is firmly up against the fixed panel block 12 and fully inserted into the short seals 9 Hint Wet the edge of glass and seal to make it easier to insert...

Страница 5: ...Recheck measurements 3 Remove jambs and drill 6mm holes with drill bit Insert the plastic wall plugs Note Please use the right fixing for the surface you are screwing into to ensure that the jamb is...

Страница 6: ...ing doors 4 are parallel to the fixed panels 3 and parallel to each other Note Do not overtighten top rollers as this will cause the bottom rollers to jamb and or break Gently knock the sealing strips...

Страница 7: ...ause you physical harm Always inspect and count parts supplied before installing as warranty may be voided on certain components once installation has begun Ensure that all walls are plumb and the sho...

Страница 8: ...provided by Gemini Industries Pty Ltd ABN 87 079 297 617 2 97 Banksia St Botany NSW 2019 P 1300 717 717 F 1300 746 480 E sales gemini industries net Gemini Industries provides a 1 year parts and labo...

Отзывы: