background image

5

daintree 

curved shower screen

   

    

IMPORTANT INFORMATION

 

JohnsonSuisse

3

1

2

855 - 880mm

  914×914 

950 - 975mm  1000×1000

6mm

3.5×35SS

Min   Max    size

4

 

 

 

2

2

5

3

3

 

 

 

 

14

 

14

4

4

5

3

3

13

13

5

6

7

1  Measure  your  shower  base/shower  area.  The 

measurement to the outside edge of the of the wall 

jambs(1) should be somewhere within the min and max 

size of the screen. 

Min  

Max  

Screen Size

855mm  

880mm  

914×914mm

950mm  

975mm  

1000×1000mm

If you are using the maximum size make sure that you allow 
for walls that may be out of plumb. If you walls are 10mm out 

of plumb reduce your screen area by this amount.

2  Use a level ensure jambs (1) are plumb then mark the 

outside edges with pencil. Recheck measurements.

3  Remove jambs and drill 6mm holes with drill bit. Insert 

the plastic wall plugs. 

Note:  Please  use  the  right  fixing  .for  the  surface  you  are 

screwing into to ensure that the jamb is fixed securely 

to the wall. eg: toggle wall plug.

4  Using a level ensure jambs (1) are plumb and the holes 

in the jamb line up with the holes in the wall. Fix jamb to 

wall using the screws provided.

Adjust the sliding doors(4) using the screws located on the 
bottom of top roller assemblies(13). Adjust rollers so that 
the sliding doors (4) are parallel to the fixed panels(3) and 

parallel to each other. Note: Do not overtighten top rollers 
as this will cause the bottom rollers to jamb and or break.

Adjust  fixed  panel  extrusions(2)  in  or  out  on  the  wall 
jambs(1)  so  that  the  top  rail(5)  is  horizontal  and  the 

whole screen sits square on the shower base/shower 

area.(B=C=D)

Содержание daintree curved shower screen

Страница 1: ...1 daintree curved shower screen INSTALLATION GUIDE JohnsonSuisse...

Страница 2: ...do so other secure means of fixing must then be considered AFTER CARE INSTRUCTIONS This shower screen has been treated with EnduroShield easy to clean glass surface treatment Please follow the care in...

Страница 3: ...l jambs 2 2 x Fixed panel extrusions 3 2 x Fixed panels 4 2 x Sliding doors 5 1 xTop rail 6 1 x Bottom rail 7 4 x Sealing strips 8 2 x Fixed panel seal long 9 4 x Fixed panel seal short 10 2 x Magneti...

Страница 4: ...ated in the top rail 5 Make sure that the panel is firmly up against the fixed panel block 12 and fully inserted into the short seals 9 Hint Wet the edge of glass and seal to make it easier to insert...

Страница 5: ...Recheck measurements 3 Remove jambs and drill 6mm holes with drill bit Insert the plastic wall plugs Note Please use the right fixing for the surface you are screwing into to ensure that the jamb is...

Страница 6: ...ing doors 4 are parallel to the fixed panels 3 and parallel to each other Note Do not overtighten top rollers as this will cause the bottom rollers to jamb and or break Gently knock the sealing strips...

Страница 7: ...ause you physical harm Always inspect and count parts supplied before installing as warranty may be voided on certain components once installation has begun Ensure that all walls are plumb and the sho...

Страница 8: ...provided by Gemini Industries Pty Ltd ABN 87 079 297 617 2 97 Banksia St Botany NSW 2019 P 1300 717 717 F 1300 746 480 E sales gemini industries net Gemini Industries provides a 1 year parts and labo...

Отзывы: