4.7 MOTO
1) Turn off p
2) Remove
3) Disconne
4) Remove
5) Remove
6) Reverse
Note.
Replace any
OR CONTR
power and d
the motor co
ect the wire c
the 2 screws
the MCB.
Steps 1-5 to
y wire ties re
CHA
ROL BOAR
isconnect the
over as outlin
connectors a
s holding eac
o install a new
emoved.
APTER 4:
RD (MCB)
e cord from t
ned in Sectio
at the MCB. (
ch side of the
Fig-1
w MCB. Make
Part Rep
) REPLAC
the machine
on 4.1.
(Fig-1)
e MCB to the
e sure that a
placement
EMENT
.
e frame .
all wires remo
Guide
oved during S
Step 3 are re
30
e-connected.
0
.
Содержание AFG Pro 7.2AT
Страница 2: ...Prod duct Br rowse 2 2...
Страница 5: ...1 1 Serial SERIAL N l Number NUMBER CHAP Location PTER 1 S Serial Number Locatio on 5 5...
Страница 9: ...CONSOLE E ELECTRIC CAL DIAGR CHAPTER RAM R 3 Troubleshooting 9 9...
Страница 12: ...3 2 2 Engineering Mo ode CHAPTER R3 Troub bleshooting g 12 2...
Страница 13: ...13 3...