4.3 SIDE
1) Remove
2) Slide the
3) Slide the
4) Reverse
Note.
After reinst
gap spacing
RAIL REP
the rear end
rail off the b
rail off the b
Steps 1-2 to
talling the sid
g. Be careful
CH
PLACEME
d cap (Fig-1).
back of the tre
Fig-1
back of the tre
o install a new
de rail, make
not to over t
HAPTER 4
NT
. See section
eadmill (Fig-
eadmill
w side rail.
e sure the rea
tighten the sc
4: Part Re
n 4.2
-2).
ar end cap is
crews, or the
eplacemen
s on first befo
ey will poke t
nt Guide
Fig
ore tightening
through the t
g-2
g the screws
top of the sid
26
s for proper
de rail.
6
Содержание AFG Pro 7.2AT
Страница 2: ...Prod duct Br rowse 2 2...
Страница 5: ...1 1 Serial SERIAL N l Number NUMBER CHAP Location PTER 1 S Serial Number Locatio on 5 5...
Страница 9: ...CONSOLE E ELECTRIC CAL DIAGR CHAPTER RAM R 3 Troubleshooting 9 9...
Страница 12: ...3 2 2 Engineering Mo ode CHAPTER R3 Troub bleshooting g 12 2...
Страница 13: ...13 3...