![Johnson 4 HORSEPOWER Скачать руководство пользователя страница 28](http://html1.mh-extra.com/html/johnson/4-horsepower/4-horsepower_operators-manual_2022848028.webp)
26
- Operation
FLUSHING
See your Dealer for a flushing device designed to fit
your engine. Follow manufacturer’s instructions for
installing and using it.
Outboard — Running
1)
Place the engine in vertical position in a well-
ventilated area with good drainage.
2)
Remove the plug from the flushing port.
3)
Install flushing device and garden hose.
4)
Cover the water intake hole with tape.
5)
Place the shift lever in NEUTRAL with the
propeller removed.
6)
Start the water — keep pressure between 20
to 40 psi (140 to 300 kPa).
1.
Flushing device
2.
Tape
7)
Start the engine —
run it at idle only
and
flush it for at least five minutes.
8)
Shut OFF the engine, then turn off the water.
9)
Remove the tape and reinstall the flushing
port.
10)
Leave the outboard in vertical position long
enough to completely drain the powerhead.
DANGER
DO NOT run the engine indoors or without
adequate ventilation or permit exhaust
fumes to accumulate in confined areas.
Engine exhaust contains carbon monoxide
which, if inhaled, can cause serious brain
damage or death.
WARNING
Prevent injury from contact with rotating
propeller; remove the propeller before
flushing.
2
1
Содержание 4 HORSEPOWER
Страница 48: ...46 Installation BRP US Inc Evinrude Johnson Dealer Support Services 250 Seahorse Drive Waukegan IL 60085...
Страница 50: ...48 Installation BRP US Inc...
Страница 52: ...5035751...