FORM 145.18-IOM1
ISSUE DATE: 8/30/2018
2
SECTION 2 - OPERATION
Once the installation is complete and the system is
cleaned and flushed, begin unit start-up. Open the sup-
ply and return shut-off valves at each unit, refill the
system, and bleed off all air.
PRE-START-UP CHECKLIST
Before energizing the unit, perform the following
checks and complete the Vertical Stacked Heat Pump
Start-Up and Performance Checklist (
Form 145.18-
CL1
) in compliance with warranty requirements.
The high voltage power supply is correct and in
accordance with the nameplate ratings.
The field wiring and circuit protection are the cor-
rect size.
The unit is electrically grounded.
The low voltage control wiring is correct per the
unit wiring diagram.
There is vibration isolation (for example, unit iso-
lation pad, flexible hoses).
The low-side or high-side pressure temperature
caps are secure and in place.
All the unit access panels are secure and in place.
The thermostat is in the OFF position.
The water flow is established and circulating
through all the units.
The ductwork (if required) is correctly sized, run,
taped, and insulated.
The indoor blower turns freely without rubbing.
If applicable, glycol fluid was added in the proper
mix to prevent freezing in closed system applica-
tion.
Clean, properly sized air filters are in place.
The condensate drain pipe is firmly secured to
both the drain riser and the drain pan stub.
INITIAL UNIT START-UP
During installation, testing, servicing,
and troubleshooting of this product, it
may be necessary to work with live electri-
cal components. Failure to follow all elec-
trical safety precautions when exposed to
live electrical components could result in
serious injury or death.
1. Close the disconnect switches on all units to pro-
vide line power.
2. Set the thermostat to the highest temperature set-
ting.
3. Set the thermostat system switch to COOL and
the fan control switch to AUTO. The compressor
should NOT run.
4. Reduce the temperature control setting until the
compressor and supply fan energize, with the
following results:
• Water temperature leaving the heat exchang-
er is warmer than the entering water temper-
ature (EWT) (approximately 9.0–12.0°F).
• The blower operation is smooth.
• The compressor and blower amps are within
the nameplate data values.
• The suction line is cool with no frost ob-
served in the refrigerant circuit.
5. Turn the thermostat switch to the OFF position.
The compressor and fan stop running and the re-
versing valve de-energizes.
6. To allow for pressure equalization, leave the unit
off for approximately 5 minutes.
7. Turn the thermostat to the lowest setting.
8. Set the thermostat system switch to the HEAT po-
sition. The compressor should NOT run.
9. Adjust the temperature setting upward until the
compressor and supply fan energize, with the fol-
lowing results after several minutes:
• Warm air is detected at the supply register.
• The water temperature decreases approxi-
mately 5.0–9.0°F across the heat exchanger.
Содержание VB09
Страница 44: ...44 FORM 145 18 IOM1 ISSUE DATE 8 30 2018 Section 3 Maintenance THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 45: ...45 FORM 145 18 IOM1 ISSUE DATE 8 30 2018 APPENDIX LD23571 Figure 29 PSC MOTOR WIRING DIAGRAM...
Страница 46: ...46 FORM 145 18 IOM1 ISSUE DATE 8 30 2018 Appendix LD23572 Figure 30 ECM WIRING DIAGRAM...
Страница 47: ...47 Appendix FORM 145 18 IOM1 ISSUE DATE 8 30 2018 LD27633 Figure 31 CONTINUOUS FAN WITH ECM WIRING DIAGRAM...
Страница 48: ...48 FORM 145 18 IOM1 ISSUE DATE 8 30 2018 Appendix LD23574 Figure 32 MOTORIZED DAMPER ECM WIRING DIAGRAM...