background image

1083288-UIM-A-0114

Johnson Controls Unitary Products

25

VENT SYSTEM

This furnace is certified to be installed with one of two possible vent
configurations.
1. Horizontal vent system. This vent system can be installed com-

pletely horizontal or combinations of horizontal, vertical, or offset
using elbows.

2. Vertical vent system. This vent system can be installed completely

vertical or a combination of horizontal, vertical, or offset using
elbows.

VENT APPLICATIONS AND TERMINATION

When selecting the location for a combustion air / vent termination, the
following should be considered:
1. Observe all clearances listed in vent clearances in these instruc-

tions.

2. Termination should be positioned where vent vapors will not dam-

age plants, shrubs or air conditioning equipment.

3. Termination should be located where it will not be affected by wind

gusts, light snow, airborne leaves or allow recirculation of flue
gases.

4. Termination should be located where it will not be damaged or

exposed to flying stones, balls, etc.

5. Termination should be positioned where vent vapors are not objec-

tionable.

6. Horizontal portions of the vent system must slope upwards and be

supported to prevent sagging.

7. Direct vent systems must be installed so the vent and the combus-

tion air pipes terminate in the same atmospheric zone. Refer to Fig-
ures 28 or 29.

VENTING MULTIPLE UNITS

Multiple units can be installed in a space or structure as either a single
pipe configuration or a two-pipe configuration.
The combustion air side of the single pipe configuration shown in Fig-
ures 27 and 34 is referred to in these instructions as ambient combus-
tion air supply. Follow the instructions for ambient combustion air
installations, paying particular attention to the section on air source from
inside the building. The vent for a single pipe system must be installed
as specified in the venting section of these instructions with both vents
terminating as shown in Figure 27. Each furnace must have a separate
vent pipe. Under NO circumstances can the two vent pipes be tied
together.
The combustion air side of the two-pipe configuration shown in Figures
28 and 29 can be installed so the combustion air pipe terminates as
described in outdoor combustion air or ventilated combustion air sec-
tions in these instructions. Follow the instructions for outdoor combus-
tion air or ventilated combustion air and the instructions for installing the
vent system with the vent terminating as shown in Figure 30 or 31. The
two-pipe system must have a separate combustion air pipe and a sepa-
rate vent pipe for each furnace. Under NO circumstances can the two
combustion air or vent pipes be tied together. The combustion air and
vent pipes must terminate in the same atmospheric zone.

 FIGURE 27:  

Termination Configuration - 1 Pipe

 

Condensation in Intake Pipe

Installations where the furnace and intake pipe are to be located in a
conditioned space and in a region that may have hot, humid weather
extending several consecutive days will have condensate form in the
intake pipe. Use of the supplied intake drain will ensure that any con-
densate will be safely diverted away from the internal components of
the furnace. Proper venting installation (of both intake and exhaust)
and sealing any equipment air leaks that might contact the intake pipe
will help reduce condensation.

12” Min.

12” Min.

Maintain 12” minimum clearance
above highest anticipated snow level.
Maximum 24” above roof.

 FIGURE 28:  

Termination Configuration - 2 Pipe

 FIGURE 29:  

Termination Configuration - 2 Pipe Basement

Maintain 12” minimum
clearance above
highest anticipated
snow level.

12” vertical separation
between combustion air
intake and vent.

12” minimum
below overhang

12” minimum
separation between
bottom of
combustion air pipe
and bottom of vent.

Maintain 12”
minimum clearance
above highest
anticipated snow
level or grade,
whichever is higher.

12” MIN.

12” MIN.

OVERHANG

12” Minimum
below overhang

12” Minimum
separation between
bottom of
combustion air
intake and
bottom of vent

Maintain 12”
minimumclearance
above highest
anticipated snow
level or grade,
whichever is higher

Содержание TM9X

Страница 1: ...n 26 Downward Venting 26 Direct Vent Air Intake Connection and Vent Connection 26 Combustion Airflow Path Through The Furnace Casing 27 Ambient Combustion Air 28 Attic and Crawl Space Combustion Air T...

Страница 2: ...ition input rate temperature rise and venting according to the manufacturer s instructions 10 When installed in a non HUD Approved Modular Home or building constructed on site combustion air shall not...

Страница 3: ...ng jurisdiction In the United States and Canada follow all codes and standards for the following using the latest edition available STEP 1 Safety US National Fuel Gas Code NFGC NFPA 54 ANSI Z223 1 and...

Страница 4: ...on FOR FURNACES INSTALLED IN THE COMMON WEALTH OF MASSACHUSETTS ONLY For all side wall horizontally vented gas fueled equipment installed in every dwelling building or structure used in whole or in pa...

Страница 5: ...r This access cover shall be attached in such a manner as to prevent leaks DUCT FLANGES Four flanges are provided to attach ductwork to the furnace These flanges are rotated down for shipment In order...

Страница 6: ...tal left hand applications no conversion is required to an MC coil when used with a downflow horizontal furnace A mounting plate supplied with every coil should always be installed on the side desig n...

Страница 7: ...n a flat solid surface this bottom panel will provide an adequate seal to prevent air leakage through the unused bottom opening However if the furnace is to be installed on a surface that is uneven or...

Страница 8: ...e one support located approximately in the center of the furnace near the blower shelf and the third support should be at the return end of the fur nace Maintain a 6 15 2 cm minimum clearance between...

Страница 9: ...rain Optional Return Air Cutout Either side 29 5 For Cladded door add appoximately an additional 75 C SUPPLY END 56 56 20 B 3 23 8 56 Combustion Air Inlet Vent Outlet RETURN END B 24 25 Table 3 Cabine...

Страница 10: ...r that has previously serviced another gas appliance Some utility companies or local codes require pipe sizes larger than the minimum sizes listed in these instructions and in the codes The furnace ra...

Страница 11: ...Gas Piping Upflow Configuration Downflow Configuration Horizontal Configuration External Manual Shut off Valve External Manual Shut off Valve External Manual Shut off Valve To Gas Supply To Gas Suppl...

Страница 12: ...xide personal injury property damage a fire hazard and or death High altitude and propane LP conversions are required in order for the appliance to satisfactory meet the application An authorized dist...

Страница 13: ...Install the field supplied thermostat by following the instructions that come with the thermostat With the thermostat set in the OFF position and the main electrical source disconnected connect the th...

Страница 14: ...Single Stage Furnace STD ECM Single Stage Air Conditoner STD ECM Y Compressor 24 Volt Common C 24 Volt Common Compressor Contactor R 24 Volt Hot Y Y2 Second or Full Stage Compressor FIGURE 19 Typical...

Страница 15: ...rnace to not operate No hose clamps are needed for connecting to the condensate pan The condensate will flow to the drain better if an open stand pipe is installed in the drain line See Figure 20 If e...

Страница 16: ...ake coupling the drain opening in the vent drain must not be plugged If the intake drain is used the bird screen cannot be installed This is only approved for upflow and horizontal applications when t...

Страница 17: ...f so that no sagging loops will collect and hold condensate which will cause the furnace to not operate Shorten pressure switch hose Re route and shorten pressure switch hose Shorten rain gutter hose...

Страница 18: ...itch hose to this position NOTE May require the longer hose that is provided with wider cabinets Move condensate drain hose to this position May exit either side of the cabinet Move rain gutter hose t...

Страница 19: ...ose to this position NOTE May require the longer hose that is provided with wider cabinets Change condensate drain connection to the 90 fitting provided Move condensate drain hose to this position Mov...

Страница 20: ...tting provided Move condensate drain hose to this position Move rain gutter hose to this position Change condensate drain connection to the 90 fitting provided Move condensate drain hose to this posit...

Страница 21: ...o be used any joint where ABS pipe is joined to PVC pipe must be glued with cement that is approved for use with BOTH materials Metallic materials must not be used for venting or air intake 5 If a fle...

Страница 22: ...3 55 60 000 4 140 60 000 4 120 80 000 2 50 80 000 2 20 80 000 3 75 80 000 3 55 80 000 4 140 80 000 4 120 100 000 2 15 100 000 2 NA 100 000 3 75 100 000 3 55 100 000 4 140 100 000 4 120 120 000 3 75 1...

Страница 23: ...IGURE 25 Elbow Dimensions TABLE 9 Elbow Dimensions Elbow A Dimension Illustrated in Figure 25 2 Standard 2 5 16 3 Standard 3 1 16 2 Sweep 3 1 4 3 Sweep 4 1 16 TABLE 10 Equivalent Length of Fittings Fi...

Страница 24: ...quirements of the gas supplier 12 30 5 cm or in accordance with local installation codes and the requirements of the gas supplier F Clearance to outside corner 12 30 5 cm or in accord ance with local...

Страница 25: ...ch furnace must have a separate vent pipe Under NO circumstances can the two vent pipes be tied together The combustion air side of the two pipe configuration shown in Figures 28 and 29 can be install...

Страница 26: ...ns Refer to Ambient Combustion Air Supply for proper installa tion Refer to Figures 34 and 35 3 VENTILATED COMBUSTION AIR Combustion air is supplied through a PVC or ABS pipe that is connected to the...

Страница 27: ...adjustable louvers are not permitted for use 4 A automatically operated damper or automatically adjustable lou vers shall be interlocked so that the main burner cannot operate unless either the dampe...

Страница 28: ...322 cm2 per 0 879 kW of the total input rating of all equipment located in the enclosure b Not less than the sum of all vent connectors in the confined space 3 The duct shall be least the same cross...

Страница 29: ...clothes dryers and TURN ON any exhaust fans such as range hoods and bathroom exhausts so they shall operate at maximum speed Open the fireplace dampers Do not operate a summer exhaust fan 4 Follow th...

Страница 30: ...eter 1 Turn off all other gas appliances and pilots 2 Run furnace for a minimum of 3 minutes in heating operation 3 Measure time in sec for gas meter to complete 1 revolution and note reading The 2 cu...

Страница 31: ...300 750 78 46 92 231 25 144 288 720 80 45 90 225 26 138 277 692 82 44 88 220 27 133 267 667 84 43 86 214 28 129 257 643 86 42 84 209 29 124 248 621 88 41 82 205 30 120 240 600 90 40 80 200 31 116 232...

Страница 32: ...ng gas valve regulator screw for the appropriate gas per the following 4 After the manifold pressure has been adjusted re calculate the fur nace input to make sure you have not exceeded the specified...

Страница 33: ...n control The fan on delay is fixed at 30 seconds The fan off delay has 4 settings 60 90 120 and 180 seconds The fan off delay is factory set to 120 sec onds The fan off setting must be long enough to...

Страница 34: ...1203 1182 1150 1125 1095 1064 1031 980 Medium 1076 1059 1029 1007 973 946 908 883 843 800 Medium Low 988 967 936 903 875 838 806 765 737 685 Low 798 769 727 695 650 619 574 517 485 443 TM9X080B12MP11...

Страница 35: ...off and a retry operation begins Also if the flame is lost for 2 seconds during the 10 second stabilization period the gas valve is shut off and a retry operation begins During a retry operation the...

Страница 36: ...rmer wires Both heating and cooling operations will be affected Check polarity at furnace and branch Check furnace grounding Check that flame probe is not shorted to chassis The furnace will not start...

Страница 37: ...ING FERRULE 3 req d GASKET FOAM Door 1 5 ft req d GROMMET 3 req d HARNESS WIRING HOSE CONDENSATE HOSE RAIN GUTTER KNOB QUARTER TURN 4 req d MOTOR MOUNT ORIFICE BURNER Natural 45 PAN CONDENSATE PLUG SE...

Страница 38: ...AVEC LE SERVICE 1042427 UWD A 0413 Fault Code Retrieval To retrieve fault codes push and release ERROR button on control board The LED will flash the last five error codes beginning with the most rece...

Страница 39: ...correct black is L1 hot white is N neutral Ground wire is connected Line voltage value to furnace volts AC Low voltage value between R and C on furnace control board volts AC Thermostat Type Other Sy...

Страница 40: ...ot Selectable Explain the importance of regular filter replacement and equipment maintenance Gas Side Air Side System External Static Pressure Owner Education Additional Job Detail Supply static befor...

Отзывы: