background image

1083163-UIM-J-0918

10

Johnson Controls Unitary Products

The  furnace  must  be  isolated  from  the  gas  supply  piping  system  by
closing its individual external manual shutoff valve during any pressure
testing  of  the  gas  supply  piping  system  at  pressures  equal  to  or  less
than 0.5 psig (3.5 kPa).

Gas piping may be connected from either side of the furnace using any
of the gas pipe entry knockouts on both sides of the furnace. Refer to
Figures 8 and 11.

GAS ORIFICE CONVERSION FOR PROPANE (LP)

This furnace is constructed at the factory for natural gas-fired operation,
but may be converted to operate on propane (LP) gas by using a fac-
tory-supplied  LP  conversion  kit.  Follow  the  instructions  supplied  with
the LP kit.

HIGH ALTITUDE GAS ORIFICE CONVERSION

This furnace is constructed at the factory for natural gas-fired operation
at 0 – 7,999 feet (0 – 2,438 m) above sea level.
The  manifold  pressure  must  be  changed  in  order  to  maintain  proper
and safe operation when the furnace is installed in a location where the
altitude is greater than 7,999 feet (2,438 m) above sea level. Refer to
Table 4 for proper manifold pressure settings.

HIGH ALTITUDE PRESSURE SWITCH CONVERSION

For installation where the altitude is less than 5,000 feet (1,524m), it is
not required that the pressure switch be changed unless you are in an
area subject to low pressure inversions.

SECTION V: ELECTRICAL POWER

ELECTRICAL POWER CONNECTIONS

Field wiring to the unit must be grounded. Electric wires that are field
installed shall conform to the temperature limitation for 63°F (35°C) rise
wire when installed in accordance with instructions. Refer to Table 5 in
these instructions for specific furnace electrical data.

IMPORTANT

An accessible manual shutoff valve must be installed upstream of the
furnace gas controls and within 6 feet (1.8 m) of the furnace.

 CAUTION

The gas valve body is a very thin casting that cannot take any exter-
nal pressure. Never apply a pipe wrench to the body of the gas valve
when installing piping. A wrench must be placed on the octagon hub
located on the gas inlet side of the valve. Placing a wrench to the
body of the gas valve will damage the valve causing improper opera-
tion and/or the valve to leak.

!

Table 4: 

Nominal Manifold Pressure - High Fire

Gas Heating 

Value

(BTU/cu ft.)

Manifold Pressures

Gas Heating 

Value

(MJ/cu m)

Manifold Pressures

Altitude (feet)

Altitude (m)

0-7999

8000-8999

9000-9999

0-2437

2438-2742

2743-3048

in. w.c.

in. w.c.

in. w.c.

kPa

kPa

kPa

800

3.5

3.5

3.5

29.8

0.87

0.87

0.87

850

3.5

3.5

3.5

31.7

0.87

0.87

0.87

900

3.5

3.5

3.5

33.5

0.87

0.87

0.87

950

3.5

3.5

3.3

35.4

0.87

0.87

0.81

1000

3.5

3.2

2.9

37.3

0.87

0.80

0.73

1050

3.5

2.9

2.7

39.1

0.87

0.73

0.67

1100

3.2

2.7

2.4

41.0

0.80

0.66

0.61

2500 (LP)

9.8

8.2

7.5

93.2 (LP)

2.44

2.03

1.86

 DANGER

PROPANE AND HIGH ALTITUDE CONVERSION KITS
It is very important to choose the correct kit and/or gas orifices for the altitude and the type of gas for which the furnace is being installed.
Only use natural gas in furnaces designed for natural gas. Only use propane (LP) gas for furnaces that have been properly converted to use pro-
pane (LP) gas. Do not use this furnace with butane gas.
Incorrect gas orifices or a furnace that has been improperly converted will create an extremely dangerous condition resulting in premature heat
exchanger failure, excessive sooting, high levels of carbon monoxide, personal injury, property damage, a fire hazard and/or death.
High altitude and propane (LP) conversions are required in order for the appliance to satisfactory meet the application.
An authorized distributor or dealer must make all gas conversions.
In Canada, a certified conversion station or other qualified agency, using factory specified and/or approved parts, must perform the conversion.
The installer must take every precaution to insure that the furnace has been converted to the proper gas orifice size when the furnace is installed.
Do not attempt to drill out any orifices to obtain the proper orifice size. Drilling out a gas orifice will cause misalignment of the burner flames, caus-
ing premature heat exchanger burnout, high levels of carbon monoxide, excessive sooting, a fire hazard, personal injury, property damage and/or
death.

!

 CAUTION

Use copper conductors only.

!

Содержание TM9E

Страница 1: ... Vent Termination 24 Downward Venting 24 Direct Vent Air Intake Connection and Vent Connection 24 Combustion Airflow Path Through The Furnace Casing 25 Ambient Combustion Air 26 Attic and Crawl Space Combustion Air Termination 27 Gas Valve 30 Reading Gas Pressure 30 Furnace Control Board 31 Wiring Diagram 36 LIST OF TABLES Unit Clearances to Combustibles 4 Cabinet and Duct Dimensions 8 Recommended...

Страница 2: ... temperature rise and venting according to the manufacturer s instructions 10 When installed in a non HUD Approved Modular Home or building constructed on site combustion air shall not be supplied from occu pied spaces 11 The size of the unit should be based on an acceptable heat loss calculation for the structure ACCA Manual J or other approved methods may be used 12 When moving or handling this ...

Страница 3: ...sdiction In the United States and Canada follow all codes and standards for the following using the latest edition available STEP 1 Safety US National Fuel Gas Code NFGC NFPA 54 ANSI Z223 1 and the Installation Standards Warm Air Heating and Air Conditioning Systems ANSI NFPA 90B CANADA CAN CGA B149 1 National Standard of Canada Natu ral Gas and Propane Installation Codes NSCNGPIC STEP 2 General I...

Страница 4: ...URNACES INSTALLED IN THE COMMON WEALTH OF MASSACHUSETTS ONLY For all side wall horizontally vented gas fueled equipment installed in every dwelling building or structure used in whole or in part for resi dential purposes including those owned or operated by the Com monwealth and where the side wall exhaust vent termination is less than seven 7 feet above finished grade in the area of the venting i...

Страница 5: ...s cover shall be attached in such a manner as to prevent leaks DUCT FLANGES Four flanges are provided to attach ductwork to the furnace These flanges are rotated down for shipment In order to use the flanges remove the screw holding an individual flange rotate the flange so it is in the upward position and reinstall the screw then repeat this for all 4 flanges If the flanges are not used they must...

Страница 6: ...tom opening However if the furnace is to be installed on a surface that is uneven or if it is to be installed on blocks or otherwise raised off the floor it will be necessary to seal the edges of the bottom panel to the casing using tape or other appropriate gasket material to prevent air leakage BOTTOM RETURN AND ATTIC INSTALLATIONS Bottom return applications normally pull return air through a ba...

Страница 7: ...rt located approximately in the center of the furnace near the blower shelf and the third support should be at the return end of the fur nace Maintain a 6 15 2 cm minimum clearance between the front of the furnace and the support rods or straps All six suspension points must be level to ensure proper and quiet fur nace operation When suspending the furnace use a secure platform constructed of plyw...

Страница 8: ... 2XWOHW 9HQW RQQHFWLRQ 2XWOHW 9HQW RQQHFWLRQ 2XWOHW Table 2 Cabinet and Duct Dimensions BTUH kW Input Nominal CFM m3 min Cabinet Size Cabinet Dimensions Illustrated in Figure 13 Approximate Operating Weights A in A cm B in B cm C in C cm Lbs kg 40 11 7 1000 28 3 A 14 1 2 36 8 13 3 8 34 0 11 3 4 29 8 113 60 17 6 1200 34 0 B 17 1 2 44 4 16 3 8 41 6 13 1 4 33 7 122 80 23 4 1200 34 0 B 17 1 2 44 4 16 ...

Страница 9: ... Refer to Figure 11 For left side supply gas pipe arrangement two 1 2 elbows and two 1 2 x 1 1 2 pipe nipples must be used The arrangement shown in Figure 11 aligns entrance hole in furnace casing with supply gas pipe Furnace casing does not support installations completed using street elbows DANGER An overpressure protection device such as a pressure regulator must be installed in the gas piping ...

Страница 10: ...ced on the octagon hub located on the gas inlet side of the valve Placing a wrench to the body of the gas valve will damage the valve causing improper opera tion and or the valve to leak Table 4 Nominal Manifold Pressure High Fire Gas Heating Value BTU cu ft Manifold Pressures Gas Heating Value MJ cu m Manifold Pressures Altitude feet Altitude m 0 7999 8000 8999 9000 9999 0 2437 2438 2742 2743 304...

Страница 11: ...he main electrical source disconnected connect the thermostat wiring from the wiring connections on the thermostat to the terminal board on the ignition module as shown in Figures 13 14 Electronic thermostats require the common wire to be connected Apply strain relief to thermostat wires passing through cabinet If air conditioning equipment is installed use thermostat wiring to connect the Y and C...

Страница 12: ...SUHVVRU XOO 6WDJH HDW LUVW 6WDJH RPSUHVVRU 7 50267 7 WHUQDO XPLGLVWDW 2SWLRQDO 2SHQ RQ XPLGLW 5LVH 9 XPLGL HU 2SWLRQDO FIGURE 15 Thermostat Chart 1H 2C Single Stage Furnace STD ECM Single Stage Air Conditioner 7KHUPRVWDW 6LQJOH 6WDJH XUQDFH 67 0 7ZR 6WDJH LU RQGLWLRQHU LUVW 6WDJH RPSUHVVRU RU 2 5HYHUVLQJ 9DOYH DQ 6HFRQG 6WDJH RPSUHVVRU 5 9ROW RW LUVW 6WDJH HDW 9ROW RPPRQ 9ROW RPPRQ 5 9ROW RW 6HFRQ...

Страница 13: ...ll flow to the drain better if an open stand pipe is installed in the drain line See Figure 15 If indoor coil or humidifier drains are combined with the furnace drain then the open stand pipe could be raised higher above the 5 minimum Do not drain other devices humidifier indoor coil etc into the top opening of the vent stand pipe Instead install a second tee in the vented drain tube below the fur...

Страница 14: ...d the bird screen cannot be installed This is only approved for upflow and horizontal applications when the intake pipe is located on the top of the furnace This is true for all long horizontal venting in any furnace configuration This will keep condensate from entering the furnace WARNING DO NOT terminate the condensate drain in a chimney or where the drain line may freeze If the drain line will ...

Страница 15: ...ff so that no sagging loops will collect and hold condensate which will cause the furnace to not operate Shorten pressure switch hose Re route and shorten pressure switch hose Shorten rain gutter hose Move rain gutter hose to this position For 100 120 input furnaces the condensate drain is plumbed toward the left casing outlet from the factory For 040 060 080K input furnaces the condensate drain i...

Страница 16: ...witch hose to this position NOTE May require the longer hose that is provided with wider cabinets Move condensate drain hose to this position May exit either side of the cabinet Move rain gutter hose to this position When drain hose routing changes are required be sure to cap all un used openings If rerouting hoses excess length should be cut off so that no sagging loops will collect and hold cond...

Страница 17: ...ch hose to this position NOTE May require the longer hose that is provided with wider cabinets Change condensate drain connection to the 90 fitting provided Move condensate drain hose to this position Move rain gutter hose to this position NOTE May require hose extension that is provided with wider cabinets Move condensate drain hose to this position Change condensa drain connection to the 90 fitt...

Страница 18: ...itting provided Move condensate drain hose to this position Move rain gutter hose to this position Change condensate drain connection to the 90 fitting provided Move condensate drain hose to this position AIRFLOW Move pressure switch hose to this position When drain hose routing changes are required be sure to cap all un used openings If rerouting hoses excess length should be cut off so that no s...

Страница 19: ...e combustion air pipe 6 All models are supplied with 2 5 1 cm vent connections When the pipe must be increased to 3 7 6 cm diameter the transition from 2 to 3 must be done as close to the furnace as possible The 2 to 3 increase should be installed in the vertical position as to not create an area that will pool water 7 In Canada vents shall be certified to ULC S636 Standard for Type BH Gas Venting...

Страница 20: ...45 80 000 4 125 100 000 2 20 100 000 2 NA 100 000 3 80 100 000 3 60 100 000 4 145 100 000 4 125 120 000 3 80 120 000 3 60 120 000 4 145 120 000 4 125 Elevation 4001 5000 Elevation 8001 9000 Model Input BTUH Pipe Size in Max equivalent Length ft Model Input BTUH Pipe Size in Max equivalent Length ft 40 000 2 50 40 000 2 30 40 000 3 75 40 000 3 55 40 000 4 140 40 000 4 120 60 000 2 50 60 000 2 30 60...

Страница 21: ...PRESSURE SWITCHES REQUIRED FOR ALL INSTALLTIONS ABOVE 5000 FEET Part Number Models S1 1PS3302 100k 120k S1 1PS3306 60k S1 1PS3307 40k 80k FIGURE 21 Elbow Dimensions TABLE 8 Elbow Dimensions Elbow A Dimension Illustrated in Figure 25 2 Standard 2 5 16 3 Standard 3 1 16 2 Sweep 3 1 4 3 Sweep 4 1 16 TABLE 9 Equivalent Length of Fittings Fitting Equivalent Length 2 90 sweep elbow 5 feet of 2 pipe 2 45...

Страница 22: ...1083163 UIM J 0918 22 Johnson Controls Unitary Products IMPORTANT The vent must be installed with the minimum required clearances and must comply with local codes and requirements ...

Страница 23: ...rements of the gas supplier 12 30 5 cm or in accordance with local installation codes and the requirements of the gas supplier F Clearance to outside corner 12 30 5 cm or in accordance with local installation codes and the requirements of the gas supplier 12 30 5 cm or in accordance with local installation codes and the requirements of the gas supplier G Clearance to inside corner 3 feet 91 4 cm 3...

Страница 24: ...h furnace must have a sepa rate vent pipe Under NO circumstances can the two vent pipes be tied together The combustion air side of the two pipe configuration shown in Figures 25 26 can be installed so the combustion air pipe terminates as described in outdoor combustion air or ventilated combustion air sec tions in these instructions Follow the instructions for outdoor combus tion air or ventilat...

Страница 25: ...rmina tions Refer to Ambient Combustion Air Supply for proper installa tion Refer to Figure 29 3 VENTILATED COMBUSTION AIR Combustion air is supplied through a PVC or ABS pipe that is connected to the PVC coupling attached to the burner box and is terminated in a ventilated attic or crawl space The combustion air and the vent pipes are not termi nated in the same atmospheric zone Refer to Figure 3...

Страница 26: ...able louvers are not permitted for use 4 A automatically operated damper or automatically adjustable lou vers shall be interlocked so that the main burner cannot operate unless either the damper or the louver is in the fully open position FIGURE 30 Combustion Airflow Path Through The Furnace Casing WARNING This type of installation requires that the supply air to the appliance s be of a sufficient...

Страница 27: ...r 322 cm2 per 0 879 kW of the total input rating of all equipment located in the enclosure b Not less than the sum of all vent connectors in the confined space 3 The duct shall be least the same cross sectional area as the free area of the air supply inlet opening to which it connects 4 The blocking effects of louvers grilles and screens must be given consideration in calculating free area If the ...

Страница 28: ...nd horizontal pitch Determine that there is no blockage restriction leakage corrosion or other deficiencies which could cause an unsafe condition 2 Close all building doors and windows and all doors 3 Turn on clothes dryers and TURN ON any exhaust fans such as range hoods and bathroom exhausts so they shall operate at maximum speed Open the fireplace dampers Do not operate a summer exhaust fan 4 F...

Страница 29: ...other gas appliances and pilots 2 Run furnace for a minimum of 3 minutes in heating operation 3 Measure time in sec for gas meter to complete 1 revolution and note reading The 2 cubic feet dial provides a more accurate mea surement of gas flow 4 Refer to Table 14 for cubic feet of gas per hour 5 Multiply cubic feet per hour by heating valve BTU cu ft to obtain input If clocked rate does not match ...

Страница 30: ...0 300 750 78 46 92 231 25 144 288 720 80 45 90 225 26 138 277 692 82 44 88 220 27 133 267 667 84 43 86 214 28 129 257 643 86 42 84 209 29 124 248 621 88 41 82 205 30 120 240 600 90 40 80 200 31 116 232 581 92 39 78 196 32 113 225 563 94 38 76 192 33 109 218 545 96 38 75 188 34 106 212 529 98 37 74 184 35 103 206 514 100 36 72 180 36 100 200 500 102 35 71 178 37 97 195 486 104 35 69 173 38 95 189 4...

Страница 31: ...e operating instruc tions to place the unit back in operation 3 Adjust manifold pressure by adjusting gas valve regulator screw for the appropriate gas per the following 4 After the manifold pressure has been adjusted re calculate the fur nace input to make sure you have not exceeded the specified input on the rating plate Refer to CALCULATING THE FURNACE INPUT NATURAL GAS 5 Once the correct BTU k...

Страница 32: ...ue gas sample for analysis it is permissible to drill a small hole in the plastic flue pipe for a sample probe provided that the vent piping is PVC and the hole is properly sealed afterwards If using a polypropylene vent system the vent sys tems manufacturer test port fitting must be used DO NOT drill a test port hole in polypropylene piping Use the following procedure 1 Drill a 11 32 hole in the ...

Страница 33: ...High 1445 1423 1397 1365 1339 1311 1283 1250 1204 1140 Medium High 1282 1266 1232 1211 1182 1157 1128 1097 1069 1013 Medium 1098 1084 1059 1027 998 967 939 910 879 822 Medium Low 1012 993 953 930 894 851 828 773 752 692 Low 865 810 763 730 689 628 594 520 496 448 TM9E080C16MP11 High 1713 1682 1643 1600 1558 1519 1480 1436 1385 1333 Medium High 1554 1519 1485 1439 1404 1368 1327 1280 1176 1130 Medi...

Страница 34: ...in the area surrounding burner exceeds its set point the gas valve is de energized The operation of this control indicates a malfunction in the combustion air blower heat exchanger or a blocked vent pipe con nection Corrective action is required These are manual reset controls that must be reset before operation can continue ...

Страница 35: ...f and a retry operation begins Also if the flame is lost for 2 seconds during the 10 second stabilization period the gas valve is shut off and a retry operation begins During a retry operation the vent motor starts a 15 second inter purge and the ignitor warm up time is extended to 27 seconds If the flame is established for more than 10 seconds after ignition during a retry the control will clear ...

Страница 36: ...former wires Both heating and cooling operations will be affected Check polarity at furnace and branch Check furnace grounding Check that flame probe is not shorted to chassis The furnace will not start the ignition sequence until this problem is corrected 10 RED FLASHES Gas valve energized with no call for heat The main blower and inducer blower will run and no ignition sequence will be started a...

Страница 37: ...RING FERRULE 3 req d GASKET FOAM Door 1 5 ft req d GROMMET 3 req d HARNESS WIRING HOSE CONDENSATE HOSE RAIN GUTTER KNOB QUARTER TURN 4 req d MOTOR MOUNT ORIFICE BURNER Natural 45 PAN CONDENSATE PLUG SEAL 7 8 PLUG SEAL 2 3 8 PLUG VENT PIPE SIGHT GLASS OVAL 2 req d TUBING SILICON DESCRIPTION REPLACEMENT PART CONTACT INFORMATION This is a generic parts list To request a complete parts list refer to t...

Страница 38: ...C LE SERVICE 1042427 UWD A 0413 Fault Code Retrieval To retrieve fault codes push and release ERROR button on control board The LED will flash the last five error codes beginning with the most recent If there are no fault codes in memory the LED will give two green flashes To clear the fault code memory push and hold the ERROR button for at least five seconds The LED will give three green flashes ...

Страница 39: ...1083163 UIM J 0918 Johnson Controls Unitary Products 39 NOTES ...

Страница 40: ...xhaust Size of 90 Degree Ells 0f 45 Degree Ells Length Length 0f 45 Degree Ells of 90 Degree Ells Polarity is correct black is L1 hot white is N neutral Ground wire is connected Line voltage value to furnace volts AC Low voltage value between R and C on furnace control board volts AC Thermostat Type Other System Equipment and Accessories Owner Information Equipment Data Furnace Configuration Conde...

Страница 41: ...at exchanger cells Return Static in w c after filter furnace side Air Side Heating Air Side Cooling Air Side Continuous Fan Clean Up Give owner the owner s manual provided Gas Type Explain thermostat use and programming if applicable to owner Cycle Test Operate the furnace through several heating cycles from the thermostat noting and correcting any problems Operate the furnace through continuous f...

Отзывы: