NexSys
VAV-01 Controller
Installation Guide
7
INSPECTION
Inspect the carton for possible damage. If damaged, notify the
appropriate carrier immediately. Inspect the components for obvious
damage. Contact Electronic Systems USA before returning damaged
products.
REQUIREMENTS
• Job wiring diagrams.
• Tools (not provided):
- Appropriate screwdrivers for wiring terminals and mounting screws.
- Digital Volt/Ohm Meter (DVM).
• Training: Installer must be a qualified, experienced technician.
• VAV-01, enclosure for conduit applications (not provided).
• UL
listed Class 2 power transformer (not provided) supplying a
nominal 24 VAC (20.4 to 30 VAC) with a minimum rating of 5 VA at
50/60 Hz and 5 VA plus DO load ( 24 VA total max.) at 50/60 Hz.
LOCATION
CAUTION
• AVOID LOCATIONS WHERE EXCESSIVE MOISTURE, CORROSIVE
FUMES, EXPLOSIVE VAPORS, OR VIBRATIONS ARE PRESENT.
• AVOID ELECTRICAL NOISE INTERFERENCE. DO NOT INSTALL NEAR
LARGE CONTACTORS, ELECTRICAL MACHINERY, OR WELDING
EQUIPMENT.
• JCI VAV-01 CONTROLLERS ARE INTENDED FOR INDOOR USE ONLY.
LOCATE WHERE AMBIENT TEMPERATURES DO NOT EXCEED
131°F (55°C) OR FALL BELOW 32°F (0°C) AND RELATIVE HUMIDITY