TOOLS AND INFORMATION THAT WILL BE
REQUIRED IN ORDER TO PROPERLY PERFORM THE
FURNACE START-UP PROCECURE.
1.
Call the local gas supplier to obtain heating value of the natural
gas. If you cannot obtain the heating valve of the gas from the gas
supplier, you may use a default value of 1030 BTU/SCF (38.8 MJ /
m³).
2.
You will need a thermometer or portable digital thermometer to
read the supply and return air temperatures.
3.
You will need a U-tube manometer or digital equipment that has
the ability to read pressures between 0 – 15” in.w.c (0 - 3.73 kPa)
in order to measure the gas line and the manifold pressures.
4.
You will need a 3/32” Allen wrench for the pressure port plugs in
the gas valve.
5.
You will need 2 pieces of 1/8” (0.3 cm) ID flexible tubing that is 12”
(30 cm) in length, 2 – pieces of 1/8” (0.3 cm) tubing that are 4”
(10.0 cm) in length, and a 1/8” (0.3 cm) adapter to connect the U-
tube manometer or the digital pressure measuring equipment to
the gas valve pressure ports.
There is an accessory kit (1PK0601) available from Source 1, which
has the following items:
•
1 - 12” (30 cm) length x 1/8” (0.3 cm) diameter tubing
•
2 – pieces of 4” (10 cm) length x 1/8” (0.3 cm) diameter tubing
•
1 - 5/16” (0.8 cm) tee
•
1 – 5/16” (0.8 cm) x 1/8” (0.3 cm) reducing coupling
•
1 – 1/8” (0.3 cm) adapter
There is a accessory kit (1PK0602) available from Source 1, which has
the following items:
•
12” (30 cm) length x 1/8” (0.3 cm) diameter tubing
•
2 – pieces of 4” (10 cm) length x 1/8” (0.3 cm) diameter tubing
•
1 - 5/16” (0.8 cm) tee
•
1 – 5/16” (0.8 cm) x 1/8” (0.3 cm) reducing coupling
•
1 – 1/8” (0.3 cm) adapter
•
1 - Dwyer – Manometer
These items are required in order to properly perform the required start-
up procedure.
IGNITION SYSTEM SEQUENCE
1.
Turn the gas supply ON at external valve and main gas valve.
2.
Set the thermostat above room temperature to call for heat.
3.
System start-up will occur as follows:
a.
The induced draft blower motor will start and come up to
speed. Shortly after inducer start-up, the hot surface igniter
will glow for about 30 seconds.
b.
After this warm up, the ignition module will energize (open)
the main gas valve.
c.
After flame is established, the supply air blower will start in
the time set on the control board.
With furnace in operation, check all of the pipe joints, gas valve connec-
tions and manual valve connections for leakage using an approved gas
detector, a non-corrosive leak detection fluid, or other leak detection
methods. Take appropriate steps to stop any leak. If a leak persists,
replace the component.
The furnace and its equipment shut-off valve must be disconnected
from the gas supply piping system during any pressure testing of that
system at test pressures in excess of 1/2 PSI (3.45 kPa).
The furnace must be isolated from the gas supply piping system by
closing the equipment shut-off valve during any pressure testing of the
gas supply piping system.
CALCULATING THE FURNACE INPUT
(NATURAL GAS)
NOTE:
Burner orifices are sized to provide proper input rate using natu-
ral gas with a heating value of 1030 BTU/Ft
3
. If the heating value of
your gas is significantly different, it may be necessary to replace the ori-
fices.
1.
Turn off all other gas appliances connected to the gas meter.
2.
At the gas meter, measure the time (with a stop watch) it takes to
use 2 cubic ft. (0.0566 m
3
) of gas.
3.
Calculate the furnace input by using one of the following equa-
tions.
FIRE OR EXPLOSION HAZARD
Failure to follow the safety warnings exactly could result in serious
injury, death or property damage.
Never test for gas leaks with an open flame. Use a commercially
available soap solution made specifically for the detection of leaks
to check all connections. A fire or explosion may result causing
property damage, personal injury or loss of life.
Burner ignition may not be satisfactory on first start-up due to resid-
ual air in the gas line or until gas manifold pressure is adjusted. The
ignition control will make 3 attempts to light before locking out.