42
Tee Fitting Installation
(Pre-Installed)
1. Move lift to comfortable working height
and rest in locks.
2. Locate Ø21mm hole on the vertical wall of
the power runway 1983mm from the front.
As shown in Figure 1.
3. Assemble fittings as show in Detail A.
Air Hose Routing
(Pre-Installed)
1. Locate Release Valve Bracket and
assemble components supplied as
shown in Detail B.
2. Rout 10mm plastic air hose with
hydraulic
hose in cloth sheath to underside of
power runway.
3. Use provided zip ties to secure
10mm
air hose to the power runway as
shown in Detail C.
4. Once routed inside the runway, run
along the outside wall of the runway
until hose can clear hydraulic
cylinder.
5. Secure other end with zip tie to
runway as before.
6. Making sure to clear cylinder then
route along inside wall of runway
and connect to Tee. Figure 3.
Detail B
Figure 2
Figure 3
Detail C
Detail A
Содержание EELR369A
Страница 4: ... 4 1 2 SAFETY WARNING LABELS FOR 4 POST SURFACE MOUNTED ROLL ON LIFTS SAVE THESE INSTRUCTIONS ...
Страница 8: ... 8 6 ALIGNMENT LAYOUT Aligner mount holes Figure 2 ...
Страница 20: ... 20 Figure 18 ...
Страница 26: ... 26 10 PARTS LIST 10 1 LIFT ASSEMBLY Figure 24 ...
Страница 38: ... 38 Jack Beam Installation Operation and Maintenance Manual Parts Breakdown ...
Страница 41: ... 41 LAYOUT VIEW Figure 1 ...