- 25 -
Raise the vehicle until locks are free.
Disengage the locks by depressing the palm button and holding it.
Lower the vehicle by depressing the lowering valve handle. Watch lift to ensure that the lift
is lowering evenly. If not, raise lift and check all locks to ensure they are disengaged before
trying to lower lift again.
Continue to lower the vehicle until the crossbeams stop against the base plate. It is
important to fully lower the lift to release hydraulic pressure on the system.
Loss of Power
If for any reason, the lift will not raise off the locks or the locks will not retract, consult
factory authorized personnel.
DO NOT OVERRIDE ANY SAFETY FEATURE IN AN ATTEMPT TO LOWER THE LIFT.
Maintenance
To avoid personal injury, permit only qualified personnel to perform maintenance on this
equipment. Maintenance personnel should follow lockout/tagout instructions per ANSI
Z244.1.
The following maintenance points are suggested as the basis of a routine maintenance
program. The actual maintenance program should be tailored to the installation. See
ANSI/ALI ALOIM booklet for periodic inspection checklist and maintenance log sheet.
If lift stops short of full rise or chatters, check fluid level and bleed both cylinders per
Installation Instructions.
When lift is not being used for a period of time (over night or weekend), lift the runways in
the mid to upper position in order to allow air flow under runways and not allow moisture to
build on cables and pulleys. this will prevent premature failure of components.
Replace all Safety, Warning or Caution Labels if missing or damaged. (
See Installation
instructions page 3.
)
Daily
Keep lift components clean.
To keep alignment lifts with rear slip plates working
properly use compressed air to blow out any debris from the bearing area.
Check for loose or broken parts.
Check hydraulic system for fluid leaks.
Check lock release activation.
Weekly
Check cables and pulleys for wear or damage. Replace as required with genuine parts.
Inspect lock mechanism for proper function.
Monthly
Torque concrete anchor bolts to 80 ft-lbs.
Clean and inspect cables and pulleys for wear or damage. Lubricate cables and pulleys
with light oil.
Visually inspect concrete floor for cracks and/or spalls within 12” of base plate
IMPORTANT! Failure to keep lift free of corrosive agents and solvents will lead to
reduced service life, which could result in property damage and/or personal
injury.
If any problems are encountered, contact your local service representative.
Содержание EELR369A
Страница 4: ... 4 1 2 SAFETY WARNING LABELS FOR 4 POST SURFACE MOUNTED ROLL ON LIFTS SAVE THESE INSTRUCTIONS ...
Страница 8: ... 8 6 ALIGNMENT LAYOUT Aligner mount holes Figure 2 ...
Страница 20: ... 20 Figure 18 ...
Страница 26: ... 26 10 PARTS LIST 10 1 LIFT ASSEMBLY Figure 24 ...
Страница 38: ... 38 Jack Beam Installation Operation and Maintenance Manual Parts Breakdown ...
Страница 41: ... 41 LAYOUT VIEW Figure 1 ...