SAFETY
STANDARDS
FOR
TRANSPORT
189
MUX20JP021602
Boom
Lift
Models X20JPLUS
13.3.2.Lifting
the
machine
using
ropes
or
chains
The
machine
is
equipped
with
4
eyelets,
positioned
on
the
base,
allowing
to
lift
the
machine
through
4
ropes
or
chains
of
suitable
length
and
capacity.
To
properly
lift
the
platform
it
is
necessary
to
use
a
sling
bar
of
adequate
size
and
features,
with
a
distance
between
hooks
from
550
to
730
mm.
The
minimum
ca
‐
pacity
required
for
each
rope,
chain
or
sling
used
must
be
sufficient
to
ensure
the
support
of
the
whole
structure
to
be
lifted
and
their
length
must
ensure
that
the
sling
bar
is
positioned
higher
than
the
machine
and
that
it
does
not
touch
the
pla
‐
tform
during
the
lifting
phases.
The
following
pictures
are
the
guidelines
for
ma
‐
chine
lifting.
Fig.
179
Ropes
or
chains
lifting
points
Содержание X20JPLUS
Страница 2: ......
Страница 8: ...MUX20JP021602 6 Boom Lift Models X20JPLUS...
Страница 34: ...32 Boom Lift Models X20JPLUS TECHNICAL INFORMATIONS MUX20JP021602...
Страница 35: ...TECHNICAL INFORMATIONS 33 MUX20JP021602 Boom Lift Models X20JPLUS...
Страница 89: ...USING THE MACHINE 87 MUX20JP021602 Boom Lift Models X20JPLUS 11 3 WORKING AREA Fig 82 Working area...
Страница 163: ...MAINTENANCE 161 MUX20JP021602 Boom Lift Models X20JPLUS...
Страница 196: ...194 Boom Lift Models X20JPLUS HYDRAULIC SYSTEM MUX20JP021602 15 HYDRAULIC SYSTEM Riferimento Descrizione 1 Hand pump...
Страница 199: ...WIRING DIAGRAM 197 MUX20JP021602 Boom Lift Models X20JPLUS 16 WIRING DIAGRAM...
Страница 200: ...198 Boom Lift Models X20JPLUS WIRING DIAGRAM MUX20JP021602 Fig 183 Petrol...
Страница 201: ...WIRING DIAGRAM 199 MUX20JP021602 Boom Lift Models X20JPLUS Fig 184 Diesel...
Страница 202: ...200 Boom Lift Models X20JPLUS WIRING DIAGRAM MUX20JP021602 Fig 185 Lithium...
Страница 204: ...202 Boom Lift Models X20JPLUS WIRING DIAGRAM MUX20JP021602 Worldwide locations...
Страница 205: ......