166
Boom
Lift
Models X20JPLUS
MAINTENANCE
MUX20JP021602
12.14.CHECKING
THE
OPERATING
PRESSURES
IN
THE
HYDRAULIC
SY
‐
STEM
1
Connect
the
pressure
gauge
to
the
pressure
intake
on
the
aluminium
delivery
manifold
block.
First
connect
fitting
upper
pressure
intake.
2
Go
to
the
control
position
and
switch
the
machine
on.
A
pressure
gauge,
with
a
minimum
scale
of
250
bars,
must
be
used
to
carry
out
this
check.
Make
sure
that
the
machine
is
closed
and
in
the
resting
position.
Make
sure
that
no
one
is
standing
within
the
machine
operating
range.
All
the
specified
checks
must
be
carried
out
from
the
control
position
in
the
basket.
Fig.
167
Pressure
check
on
the
machine
Содержание X20JPLUS
Страница 2: ......
Страница 8: ...MUX20JP021602 6 Boom Lift Models X20JPLUS...
Страница 34: ...32 Boom Lift Models X20JPLUS TECHNICAL INFORMATIONS MUX20JP021602...
Страница 35: ...TECHNICAL INFORMATIONS 33 MUX20JP021602 Boom Lift Models X20JPLUS...
Страница 89: ...USING THE MACHINE 87 MUX20JP021602 Boom Lift Models X20JPLUS 11 3 WORKING AREA Fig 82 Working area...
Страница 163: ...MAINTENANCE 161 MUX20JP021602 Boom Lift Models X20JPLUS...
Страница 196: ...194 Boom Lift Models X20JPLUS HYDRAULIC SYSTEM MUX20JP021602 15 HYDRAULIC SYSTEM Riferimento Descrizione 1 Hand pump...
Страница 199: ...WIRING DIAGRAM 197 MUX20JP021602 Boom Lift Models X20JPLUS 16 WIRING DIAGRAM...
Страница 200: ...198 Boom Lift Models X20JPLUS WIRING DIAGRAM MUX20JP021602 Fig 183 Petrol...
Страница 201: ...WIRING DIAGRAM 199 MUX20JP021602 Boom Lift Models X20JPLUS Fig 184 Diesel...
Страница 202: ...200 Boom Lift Models X20JPLUS WIRING DIAGRAM MUX20JP021602 Fig 185 Lithium...
Страница 204: ...202 Boom Lift Models X20JPLUS WIRING DIAGRAM MUX20JP021602 Worldwide locations...
Страница 205: ......