USING
THE
MACHINE
93
MUX17JP021602
Boom
Lift
Models X17JPLUS
• It
is
mandatory
to
make
new
traversing
movements
positioning
the
carriage
at
maximum
width,
every
time
the
place
you
are
traversing
allows
it.
This
will
make
steering
easier
and
increase
machine
stability.
• The
second
travel
speed
can
only
be
used
during
straight,
flat
traversing
on
solid
ground.
OPERATIONAL
PHASES
FOR
TRAVEL
a
Before
travelling,
proceed
as
follows:
– Check
that
all
instructions
previously
given
in
this
chapter
have
been
com
‐
plied
with;
– Make
sure
that
the
ground
is
compact
and
can
support
the
weight
of
the
machine;
– Check
that
there
are
no
obstacles
in
the
travel
area,
considering
the
overall
dimensions
of
the
machine;
– The
machine
is
completely
closed
and
aligned,
in
the
transport
or
stabilisa
‐
tion
position
or
with
the
JIB
arm
partially
or
totally
lifted
in
the
transport
or
stabilisation
position.
This
configuration
is
only
allowed
when
strictly
necessary
.
b
Select
the
travel
speed
according
to
the
need
and
as
described
above,
opera
‐
ting
the
relevant
button
and
checking
the
selection
on
display;
c
Operate
joysticks
1
and
8
to
move
the
tracks;
If
the
operator
attempts
to
travel
with
one
or
more
stabilisers
on
the
ground,
an
error
message
will
appear
on
the
display
warning
the
user
to
raise
the
stabilisers
in
order
to
allow
the
machine
to
travel.
Fig.
84
Error,
raise
the
outriggers
from
the
ground
before
travelling
Содержание X17JPLUS
Страница 2: ......
Страница 8: ...MUX17JP021602 6 Boom Lift Models X17JPLUS ...
Страница 34: ...32 Boom Lift Models X17JPLUS TECHNICAL INFORMATIONS MUX17JP021602 ...
Страница 87: ...USING THE MACHINE 85 MUX17JP021602 Boom Lift Models X17JPLUS 11 3 WORKING AREA Fig 79 Working area ...
Страница 162: ...160 Boom Lift Models X17JPLUS MAINTENANCE MUX17JP021602 ...
Страница 189: ...HYDRAULIC SYSTEM 187 MUX17JP021602 Boom Lift Models X17JPLUS 15 HYDRAULIC SYSTEM Riferimento Descrizione 1 Hand pump ...
Страница 192: ...190 Boom Lift Models X17JPLUS WIRING DIAGRAM MUX17JP021602 16 WIRING DIAGRAM ...
Страница 193: ...WIRING DIAGRAM 191 MUX17JP021602 Boom Lift Models X17JPLUS Fig 172 Petrol ...
Страница 194: ...192 Boom Lift Models X17JPLUS WIRING DIAGRAM MUX17JP021602 Fig 173 Diesel ...
Страница 195: ...WIRING DIAGRAM 193 MUX17JP021602 Boom Lift Models X17JPLUS Fig 174 Lithium ...
Страница 197: ...WIRING DIAGRAM 195 MUX17JP021602 Boom Lift Models X17JPLUS Worldwide locations ...
Страница 198: ...196 Boom Lift Models X17JPLUS WIRING DIAGRAM MUX17JP021602 ...
Страница 199: ......