![JLG X17JPLUS Скачать руководство пользователя страница 167](http://html1.mh-extra.com/html/jlg/x17jplus/x17jplus_operator-safety-and-general-maintenance-manual_2020112167.webp)
MAINTENANCE
165
MUX17JP021602
Boom
Lift
Models X17JPLUS
12.14.CHECKING
THE
OPERATING
PRESSURES
IN
THE
HYDRAULIC
SY
‐
STEM
1
Connect
the
pressure
gauge
to
the
pressure
intake
on
the
aluminium
delivery
manifold
block.
First
connect
fitting
upper
pressure
intake.
2
Go
to
the
control
position
and
switch
the
machine
on.
A
pressure
gauge,
with
a
minimum
scale
of
250
bars,
must
be
used
to
carry
out
this
check.
Make
sure
that
the
machine
is
closed
and
in
the
resting
position.
Make
sure
that
no
one
is
standing
within
the
machine
operating
range.
All
the
specified
checks
must
be
carried
out
from
the
control
position
in
the
basket.
Fig.
164
Pressure
check
on
the
machine
Содержание X17JPLUS
Страница 2: ......
Страница 8: ...MUX17JP021602 6 Boom Lift Models X17JPLUS ...
Страница 34: ...32 Boom Lift Models X17JPLUS TECHNICAL INFORMATIONS MUX17JP021602 ...
Страница 87: ...USING THE MACHINE 85 MUX17JP021602 Boom Lift Models X17JPLUS 11 3 WORKING AREA Fig 79 Working area ...
Страница 162: ...160 Boom Lift Models X17JPLUS MAINTENANCE MUX17JP021602 ...
Страница 189: ...HYDRAULIC SYSTEM 187 MUX17JP021602 Boom Lift Models X17JPLUS 15 HYDRAULIC SYSTEM Riferimento Descrizione 1 Hand pump ...
Страница 192: ...190 Boom Lift Models X17JPLUS WIRING DIAGRAM MUX17JP021602 16 WIRING DIAGRAM ...
Страница 193: ...WIRING DIAGRAM 191 MUX17JP021602 Boom Lift Models X17JPLUS Fig 172 Petrol ...
Страница 194: ...192 Boom Lift Models X17JPLUS WIRING DIAGRAM MUX17JP021602 Fig 173 Diesel ...
Страница 195: ...WIRING DIAGRAM 193 MUX17JP021602 Boom Lift Models X17JPLUS Fig 174 Lithium ...
Страница 197: ...WIRING DIAGRAM 195 MUX17JP021602 Boom Lift Models X17JPLUS Worldwide locations ...
Страница 198: ...196 Boom Lift Models X17JPLUS WIRING DIAGRAM MUX17JP021602 ...
Страница 199: ......