Index
2
31211476
M
Maintenance Schedule
Every 1000 Hours ....................................7
Every 1500 Hours ....................................7
Every 400 Hours.......................................7
Every 50 Hours .........................................7
Every 600 Hours.......................................7
Every 8 Hours............................................7
First 50 Hours............................................7
O
Operating with a Non-Suspended Load 4
Operating with a Suspended Load.......... 4
Operation.......................................................... 4
Operational Check.......................................2
Operator Cab .................................................2
Operator Maintenance Instructions........7
Operator Presence.......................................3
Operator Seat ................................................3
P
Park Brake .........................................................3
Parking Procedure .........................................3
Performance.....................................................9
Picking Up a Suspended Load...................4
Pinch Points and Crush Hazards .............1
Placing a Load .................................................4
Placing a Suspended Load........................4
Pre-Operation Check and Inspection...... 2
R
Retrieval Hitch....................................5
Right Hand Console.....................................3
S
Safety Decals....................................................2
Safety Practices ...............................................1
Safety Signal Words.......................................1
Seat Belt...........................................................3
Seat Belt Fastened .......................................3
Shut-Down Procedure.................................. 4
Side Shift Carriage........................................5
Specifications .................................................. 9
T
This installation procedure is designed for
one-person operation ................................5
Tip Over Hazard .............................................. 1
Tires.......................................................... 7
Air Pressure .............................................7
Damage....................................................7
Replacement ..........................................7
Wheel Lug Nut ......................................... 9
Towing ............................................................... 6
Capacity...................................................... 9
Transmission Control Lever........................ 3
Transport
Lifting ........................................................4
Tiedown ...................................................4
Transporting a Load...................................... 4
Transporting a Suspended Load .............. 4
Travel Hazard................................................... 1
W
Walk-Around Inspection.............................. 2
Warm-Up.........................................................2
Wheel Replacement....................................7
Windows..........................................................2
Содержание Skytrak 3013
Страница 3: ...Revision Log a 31211476 Re v is ion L og REVISION LOG March 27 2020 A Original Issue of Manual...
Страница 40: ...Section 2 Pre Operation and Inspection 2 14 31211476 This Page Intentionally Left Blank...
Страница 60: ...Section 3 Controls and Indicators 3 20 31211476 This Page Intentionally Left Blank...
Страница 98: ...Section 5 Attachments and Hitches 5 26 31211476 This Page Intentionally Left Blank...
Страница 102: ...Section 6 Emergency Procedures 6 4 31211476 This Page Intentionally Left Blank...
Страница 109: ...Section 7 Lubrication and Maintenance 7 7 31211476 7 4 LUBRICATION SCHEDULES 50 Hour Lubrication Schedule ON0610 ON0620...
Страница 111: ...Section 7 Lubrication and Maintenance 7 9 31211476 This Page Intentionally Left Blank...
Страница 122: ...Section 7 Lubrication and Maintenance 7 20 31211476 This Page Intentionally Left Blank...
Страница 124: ...Section 8 Additional Checks 8 2 31211476 This Page Intentionally Left Blank...
Страница 134: ...Inspection Maintenance and Repair Log Date Comments...