Section 6
-
Emergency Procedures
6
-
2
31211476
6.2 EMERGENCY LOWERING OF BOOM
In the event of total loss of engine power or hydraulic pump failure with an elevated load,
the situation must be properly evaluated and dealt with on an individual basis.
Contact
JLG Industries or the local Authorized Distributor for specific instructions.
Secure the telehandler using the following procedures:
1. Clear the area around telehandler of all personnel.
2. Engage the parking brake. Place the transmission control lever in “NEUTRAL”.
3. Block all four wheels.
4. Section off a large area under the boom to restrict any personnel from entering this
area.
5. See Service Manual for information.
Содержание Skytrak 3013
Страница 3: ...Revision Log a 31211476 Re v is ion L og REVISION LOG March 27 2020 A Original Issue of Manual...
Страница 40: ...Section 2 Pre Operation and Inspection 2 14 31211476 This Page Intentionally Left Blank...
Страница 60: ...Section 3 Controls and Indicators 3 20 31211476 This Page Intentionally Left Blank...
Страница 98: ...Section 5 Attachments and Hitches 5 26 31211476 This Page Intentionally Left Blank...
Страница 102: ...Section 6 Emergency Procedures 6 4 31211476 This Page Intentionally Left Blank...
Страница 109: ...Section 7 Lubrication and Maintenance 7 7 31211476 7 4 LUBRICATION SCHEDULES 50 Hour Lubrication Schedule ON0610 ON0620...
Страница 111: ...Section 7 Lubrication and Maintenance 7 9 31211476 This Page Intentionally Left Blank...
Страница 122: ...Section 7 Lubrication and Maintenance 7 20 31211476 This Page Intentionally Left Blank...
Страница 124: ...Section 8 Additional Checks 8 2 31211476 This Page Intentionally Left Blank...
Страница 134: ...Inspection Maintenance and Repair Log Date Comments...