Section 4
-
Operation
4
-
6
31211476
Transporting a Load
• After engaging the load and resting it against the backrest, tilt the load back to
position it for travel. Travel in accordance with the requirements set forth in Section 1-
General Safety Practices and Section 5
• Maintain a slow speed when transporting a load.
Leveling Procedure
1. Position machine in best location to lift or place load.
2. Apply parking brake and move transmission control lever to NEUTRAL.
3. Observe level indicator to determine whether machine must be leveled prior to
lifting load.
4. Move boom/attachment to 4 ft (1,2 m) off ground.
Important things to remember:
• Never raise the boom/attachment more than 4 ft (1,2 m) above ground unless
telehandler is level.
• The combination of side tilt and load could cause the telehandler to tip over.
OW05
4
0
Содержание Skytrak 3013
Страница 3: ...Revision Log a 31211476 Re v is ion L og REVISION LOG March 27 2020 A Original Issue of Manual...
Страница 40: ...Section 2 Pre Operation and Inspection 2 14 31211476 This Page Intentionally Left Blank...
Страница 60: ...Section 3 Controls and Indicators 3 20 31211476 This Page Intentionally Left Blank...
Страница 98: ...Section 5 Attachments and Hitches 5 26 31211476 This Page Intentionally Left Blank...
Страница 102: ...Section 6 Emergency Procedures 6 4 31211476 This Page Intentionally Left Blank...
Страница 109: ...Section 7 Lubrication and Maintenance 7 7 31211476 7 4 LUBRICATION SCHEDULES 50 Hour Lubrication Schedule ON0610 ON0620...
Страница 111: ...Section 7 Lubrication and Maintenance 7 9 31211476 This Page Intentionally Left Blank...
Страница 122: ...Section 7 Lubrication and Maintenance 7 20 31211476 This Page Intentionally Left Blank...
Страница 124: ...Section 8 Additional Checks 8 2 31211476 This Page Intentionally Left Blank...
Страница 134: ...Inspection Maintenance and Repair Log Date Comments...