SECTION 4 - MACHINE OPERATION
4-2
– JLG Lift –
3121189
4.3 BATTERY CHARGING & MAINTENANCE
AMI Models are equipped with a 12 volt, 10 amp output - dual
voltage
(120/240V)
input battery charger. The charger is micro-
processor controlled featuring an automatic charge sensing cir-
cuit which can determine cell voltage and regulate charger
output and terminate charging as required.
Battery Maintenance and Safety
(See Figure 4-1.
)
• BATTERY ACID IS HIGHLY CORROSIVE. AVOID CONTACT
WITH SKIN AND CLOTHING AT ALL TIMES.
• BATTERY ACID RELEASES AN EXPLOSIVE GAS WHILE
CHARGING, ALLOW NO OPEN FLAMES, SPARKS OR
LIGHTED TOBACCO PRODUCTS IN THE AREA WHILE
CHARGING BATTERIES. CHARGE BATTERIES ONLY IN A
WELL VENTILATED AREA.
• ADD ONLY DISTILLED WATER TO BATTERIES. WHEN
ADDING DISTILLED WATER TO THE BATTERIES, A NON-
METALLIC CONTAINER AND/OR FUNNEL MUST BE
USED.
The battery fluid level should be approximately 1/8" (3mm)
below vent tubes.
Figure 4-1. Battery Fluid Level.
1.
Battery Filler Cap
2.
Vent Tube
3.
Fluid Level
4.
Cell Plates
1/8 "
(3mm)
1
3
2
4
Содержание 19AMI
Страница 2: ......
Страница 34: ...SECTION 3 MACHINE CONTROLS AND INDICATORS 3 6 JLG Lift 3121189 This page intentionally left blank...
Страница 46: ...SECTION 4 MACHINE OPERATION 4 12 JLG Lift 3121189 This page intentionally left blank...
Страница 61: ...SECTION 7 GENERAL SPECIFICATIONS AND OPERATOR MAINTENANCE 3121189 JLG Lift 7 7 1 2 3...
Страница 66: ......