SECTION 1 - SAFETY PRECAUTIONS
3121189
– JLG Lift –
1-9
• Do Not Attach Overhanging Loads To The Platform Or
Increase The Platform Size With Unauthorized Deck
Extensions Or Attachments.
• Do Not Tie Off Machine To Any Adjacent Structure. Never
Attach Wire, Cable Or Any Similar Items To Platform.
• Transfers Between A Structure And The Platform Expose
Operators To Fall Potentials. This Practice Should Be Dis-
couraged Wherever Possible. Where Transfer Must Be
Accomplished To Perform The Job, Two Lanyards Will Be
Used And The Platform Must Be Within 1 Foot (0.3 M) Of
The Adjacent - Safe And Secure - Structure. One Lanyard
Should Be Attached To The Platform, The Other To The
Structure. The Safety Lanyard That Is Attached To The
Platform Should Not Be Disconnected Until Such Time As
The Transfer To The Structure Is Complete.
• No Horseplay Is Permitted In Platform.
• Do Not Allow Personnel To Tamper With, Service, Or Oper-
ate This Machine From The Ground With Personnel In
Platform Except In An Emergency.
• During Platform Operation Keep All Body Parts Inside Plat-
form Railings.
• Never Position Ladders, Steps, Or Similar Items On Unit
To Provide Additional Reach For Any Purpose.
• When Working From Platform Both Feet Must Be Firmly
Positioned On Deck.
• Do Not Extend Reach Limits Of This Machine With Addi-
tional Equipment Such As Planks, Boxes, Etc.
Falling from Platform could cause
Death or Serious Injury.
Содержание 19AMI
Страница 2: ......
Страница 34: ...SECTION 3 MACHINE CONTROLS AND INDICATORS 3 6 JLG Lift 3121189 This page intentionally left blank...
Страница 46: ...SECTION 4 MACHINE OPERATION 4 12 JLG Lift 3121189 This page intentionally left blank...
Страница 61: ...SECTION 7 GENERAL SPECIFICATIONS AND OPERATOR MAINTENANCE 3121189 JLG Lift 7 7 1 2 3...
Страница 66: ......