SECTION 4 - MACHINE OPERATION
3121165
– JLG Lift –
4-3
NOTE: If the machine is equipped with a footswitch (Japa-
nese Specification Only), the footswitch must be
depressed in conjunction with the red trigger switch,
located on the joystick. Power is removed from the
platform controls when the footswitch is released.
3.
If operating from the ground controls, position the lift
switch to up and hold until desired elevation is
achieved. If operating from the platform controls,
select lift function, squeeze and hold the red trigger
switch, move the controller backward (up) and hold
until desired elevation is reached. The lift switch
works in conjunction with the enable switch.
Lowering
ENSURE SCISSOR ARM AREA IS FREE OF PERSONNEL PRIOR
TO LOWERING PLATFORM.
NOTE: The machine is equipped with a decent alarm which
will sound as the machine is being lowered (CE
Optional).
If operating from the ground controls, position the lift
switch to down and hold until desired elevation is
achieved or until platform is fully lowered. If operating
from the platform controls, select lift function squeeze the
red trigger switch and push the controller forward (down)
and hold until desired elevation is reached or until plat-
form is fully lowered. The lift switch works in conjunction
with the enable switch.
DO NOT ‘LOWER’ WITHOUT COMPLETELY RETRACTING THE
PLATFORM EXTENSION.
Platform Extension
The machine is equipped with a mechanically extendable
deck, giving the operator better access to worksites. On
the 1930ES/2030ES/2630ES this extension adds 3 ft
(0.9m) and on the 2646ES and 3246ES the extension
adds 4 ft (1.2 m) to the front of the platform. To extend the
deck, pull out handles from latch and swing up, then use
the handles and handrail to push the extendable deck out.
To retract the deck, pull out the handles from latch and
swing up, use the handles and handrail to pull and retract
the deck. Be sure the handles are in place after the deck is
retracted. Maximum capacity of the deck extension is 250
lb (120 kg).
DO NOT LOWER PLATFORM WITHOUT COMPLETELY RETRACT-
ING THE PLATFORM EXTENSION.
Fold-Down Rails
DO NOT RAISE PLATFORM WITH RAILS FOLDED DOWN. THE
RAILS MUST BE IN THE UPRIGHT POSITION AND PROPERLY
PINNED WHEN RAISING THE PLATFORM.
NOTE: The rails should only be folded down when the
machine is in the stowed (fully lowered) position.
NOTE: Ensure that the drywall gate at the rear of the
machine is up and locked in position.
Platform control box should be removed placed on
the platform with rails folded down.
1.
To fold down the rails, remove the 4 bail pins at the
two front corners and center of the rails.
2.
Taking a firm hold on the top rails, carefully push for-
ward and lower until the top rail rests on the middle
rail.
AFTER THE RAILS HAVE BEEN FOLDED DOWN USE EXTREME
CAUTION WHEN EXITING AND ENTERING THE PLATFORM.
3.
To raise the rails back to the upright position, firmly
pull the rails toward the back of the machine and
replace the bail pins into the rails. Return drywall
gate to the lowered position.
BAIL PIN
Содержание 1930ES
Страница 1: ...Operation Safety Manual Model 1930ES 2030ES 2630ES 2646ES 3246ES 3121165 September 17 2004...
Страница 2: ......
Страница 14: ...SECTION 1 SAFETY PRECAUTIONS 1 6 JLG Lift 3121165 This page intentionally left blank...
Страница 41: ...SECTION 4 MACHINE OPERATION 3121165 JLG Lift 4 7 FRONT REAR Figure 4 2 Lifting and Tie Down Diagram...
Страница 42: ...SECTION 4 MACHINE OPERATION 4 8 JLG Lift 3121165 FRONT REAR Figure 4 3 Australian Lift and Tie Down Diagram...
Страница 48: ...SECTION 6 INSPECTION AND REPAIR LOG 6 2 JLG Lift 3121165 Table 6 1 Inspection and Repair Log Date Comments...
Страница 49: ......