![JLA D30 Phase 7 Non-Coin Скачать руководство пользователя страница 55](http://html.mh-extra.com/html/jla/d30-phase-7-non-coin/d30-phase-7-non-coin_installation-manual_2019820055.webp)
51
2. Water Connections:
The water connection is made to the 1/2” M.P.T.
bushing of the electric water solenoid valve located
at the rear upper left area of the dryer (refer to
photo). The water solenoid valve has a 3/8” M.P.T.
connection and a 1/2” bushing is supplied to provide
the minimum 1/2” supply (feed) line. Flexible supply
line/coupling
must be
used in effort to avoid damage
to electric water solenoid valve.
IMPORTANT:
Flexible supply line/coupling
must be
used. Solenoid valve failure due to hard
plumbing connections WILL VOID WARRANTY.
It is recommended
that a filter
or strainer be installed in the water supply line.
Typical water supply...