![JinkoSolar JKM***M-60 Скачать руководство пользователя страница 22](http://html.mh-extra.com/html/jinkosolar/jkm-m-60/jkm-m-60_user-manual_2018532022.webp)
- 20
-
Model series
Grounding Clip
Manufacturer
Type
Group 1
~
Group 12
Tyco Electronics Corp
1954381-1
g) Follow the requirements of applicable local and national electrical codes.
h) These modules contain factory installed bypass diode. If these modules are incorrectly
connected to each other, the bypass diodes, cable or junction box may be damaged.
i) The module shall wire in accordance with the NEC, the grounding method of the frame of
arrays shall comply with the NEC, article 250.
j) CNL model shall be in accordance with CSA C22.1, Safety Standard for Electrical
Installations, Canadian Electrical Code, Part 1.
k) It is recommended that the M8 bolt be tightened to a torque of about 16~20N*m .
l) The cable of the junction box is defined as L1, as showed below. For Jinko standard
module, L1 is 900 /1200mm; and for customized module, L1 can be based on your
condition, take the cable length into consideration before designing the wiring layout.
m) Jinko Solar requires the negative grounding of the inverter when a system is installed with
standard (non-
Eagle line) PV solar modules. Alternatively, a „charge-equalizing‟ device
may be used to mitigate the effects of the Potential Induced Degradation (PID)
phenomenon that can occur in specific environments that the array is installed in.
4. Maintenance and care
a) A build up of dust or dirt on the module(s) front glass will result in a decreased energy
output. Clean the module(s) preferably once annually if possible (depend on site
conditions) using a soft cloth dry or damp, as necessary.
b) Never use abrasive material under any circumstances.
c) Examine the PV module(s) for signs of deterioration. Check all wiring for possible rodent
damage, weathering and that all connections are tight and corrosion free. Check electrical
leakage to ground.
d) Check fixing screws/bolts and mounting brackets are tight, adjust and tighten as
necessary.
e) Check the junction box and diodes as well. If you have any diodes problem, please contact
Jinko Solar.
Содержание JKM***M-60
Страница 1: ...JinkoSolar Photovoltaic Module User Manual UL1703 ...
Страница 13: ...Rev C 11 ...