Chart 5.7
JKS-3~6HLVS-ABI
5.3
Installation Instructions
5.3.1 Attention Layout
(
Length of Sensors Consider
)
There're three types of sensors for use with JKS. One is wired current sensor, one is meter
sensor, or SP-CT, if you choose wired sensor or meter. Before installing you should know
something that as below:
The cable of wired sensor and meter is suggested not longer than 15m. So you need to
consider the length between JKS with combiner box for the sensor should be installed in
the live line. And if you installed SP-CT for sensor, distance recommended not more than
30 meters.
The layout of the inverter for residential installation as follow:
5.3.2 Installation of JKS
1.Project the machine's probably sizes on the wall, the thickness of wall for JKS must be
not less than 60mm.
2.Make sure the drill position, use paper board (installation guide), put the paper board
cling to the wall, make sure the top edge of paper board is level (As the chart 5.8a
below).
3.Mark four points at the wall via the hole of the paper board, then remove the paper
board.
4.Drill four
Ф
8 holes at the mark point, the depth is not less than 55mm.
5.Knock four explosion bolt into
Ф
8 holes (As the chart 5.8b below).
6.Hang the inverter machine on the four setscrews (As the chart 5.8c below).
7.Lock the nut of setscrew (As the chart 5.8d below).
8.The whole installation has finished.
17
18
Electic meter
CT
L line
L,N
L,N
10m
5m
5m
AC
Breaker
DC
Breaker
Hybrid Inverter
DC
Breaker
AC
Breaker
Sensor
Load
E PS
PV Array
Battery
E PS
Grid
Electrical Gri
A C
Breaker
Load
A C
(a)
(b)
(c)